We have same dubs about survey time. The LEED EB: O&M 2009 Reference guide inform that the survey must be conduct either (1) each day over 5 consecutive workdays or (2) at the conclusion of 5 consecutive days. Our dubs is:

All tenants must be surveyed in same day? Or can we conduct the survey for a few days, until a significant portion of the population being surveyed?