Rethinking LPDCI-2009 EAp2: Minimum Energy Performanceposted by Brenden McEneaney on Jan 5, 2012, 4:58 pm
Apologies in advance if this belongs in a general forum... seemed more appropriate here Just some food for thought. Reducing... Last reply: Marcus Sheffer, Jan 6, 2012, 2:38 pm |
|
Electric Charging VehiclesCS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Rachel Nicely on Apr 7, 2011, 4:05 pm
I have a client that would like to install charging stations for SS 4.3 Option 2 compliance. How do you demonstrate vehicle fueling capacity per station when each electric vehicle charges at a... Last reply: Lauren Wallace, Jan 6, 2012, 12:15 pm |
|
Table PIf 3-1General forumsposted by Luis Miguel Diazgranados on Nov 17, 2011, 6:00 pm
Hi everyone: I'm working in a CS project, and I've been filling table PIf 3-1: Space Usage Type. In this project, offices are for sale, and therefore I'm not sure if the tenant spaces... Last reply: Lauren Wallace, Jan 6, 2012, 11:59 am |
|
Residential Dual Flush Fixture UsageNC-2009 WEp1: Water Use Reductionposted by Michelle Rosenberger on Dec 29, 2011, 2:31 pm
We are evaluating dual flush fixtures for our residential project. I see in the Water Use Reduction guidance the weighted average methodology. And they comment on the 1:2 ratio of full to low... Last reply: Candace Small, Jan 5, 2012, 6:20 pm |
|
WEc1CI-2009 WEc1: Water Use Reductionposted by Linda Delair on Dec 21, 2011, 5:29 pm
As 1.6 is a standard low flow toilet, in order to further reduce water use is it better to specify a 1.28 gpf or a dual flush toilet? Last reply: Candace Small, Jan 5, 2012, 6:14 pm |
|
building depth and daylighting.CI-2009 IEQc8.1: Daylight and views - daylightposted by Denise Santini on Jan 3, 2012, 3:07 pmthat way a few times. I usually go from Ecotect to Daysim. Here is the link to the Daysim forum that may help answer your specific question. http://groups.google.com/group/daysim Log in or register to post... Last reply: Jill Perry, PE, Jan 5, 2012, 6:11 pm |
|
Foundation and FootingsPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Swagata Guhathakurta on Jan 5, 2012, 5:42 pm
Can anyone tell me why Foundation and Footings are eliminated from the LEED LCA Claculator? We have to input this information in the Athena EcoCalculator, but not in the LEED LCA Calculator?... |
|
IAQ Management PlanNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Maura Adams on Jan 5, 2012, 4:08 pm
We used an EQc3.1 plan and used the testing method to meet EQc3.2 requirements. I'm looking at the online form now and wonder what's meant by this: "An Indoor Air Quality (... Last reply: Allison Beer McKenzie, Jan 5, 2012, 4:14 pm |
|
Upcoming Pilot Credit WebinarPilot-Credits PC14: Walkable Streetsposted by Chris Marshall on Jan 5, 2012, 12:55 pm
USGBC will be hosting a webinar on location- and transportation-related pilot credits on Thursday, March 22, 1:00 - 2:30... |
|
Upcoming Pilot Credit WebinarPilot-Credits PC13: Bicycle Network, Storage, and Changing Roomsposted by Chris Marshall on Jan 5, 2012, 12:54 pm
USGBC will be hosting a webinar on location- and transportation-related pilot credits on Thursday, March 22, 1:00 - 2:30... |