Topic | Recent |
---|---|
Initial Water StorageNC-v4 SSc1: Site assessmentposted by JIm Rozema on Aug 24, 2018, 11:38 am
Can you provide the definition of the Estimated TR-55 Initial Water Storage? This term is not defined in TR-55. Last reply: Thomas Lagarde, Feb 2, 2024, 5:50 pm |
|
Does type of signage matter?CI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Feb 2, 2024, 5:13 pm
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly states... |
|
Diverse uses outside the project boundary/ tenant fitout area but within the same buildingCI-v4 LTc2: Surrounding density and diverse usesposted by Ranya Metwalli Shields on Jul 4, 2019, 8:53 am
Our project is a retail tenant located within a mall. I was wondering whether shops/ restaurants within the same mall where our projectis located but outside the project boundary/ tenant fitout... Last reply: Alice Charbonneau, Feb 2, 2024, 2:02 pm |
|
Difference between v4 and v4.1Pilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Pathposted by Camilo Velez on Feb 1, 2024, 10:12 pm
Good evening, I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability: ASHRAE 90.1 version... |
|
Option 1 Path 2/3- Natural Ventilation and DESCS-v4 EAp2: Minimum Energy Performanceposted by Azra on Feb 1, 2024, 5:09 am
Hello, |
|
Modeling indirectly conditioned spacesNC-v4 EAp2: Minimum Energy Performanceposted by Gaston Michaud on Jan 31, 2024, 6:55 pm
Hi all, We are working in a CS project, and just got back the following comment from the LEED Reviewer: The SV-A reports indicate that most of the core spaces were modeled as... |
|
Modeling Proposed DHW with InsulationNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jan 31, 2024, 2:07 pm
Hi I am Modeling a... Last reply: Marcus Sheffer, Jan 31, 2024, 5:32 pm |
|
Onsite and Offsite Both?Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protectionposted by Umesh Atre on Aug 25, 2023, 1:09 pm
Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?... Last reply: Michaël Briffaz, Jan 31, 2024, 10:57 am |
|
Can ID+C be selected for whole building?CI-v4 MPR2: Must use reasonable LEED boundariesposted by Leo LeQuoc on Jan 29, 2024, 11:27 pm
Our team is working on a project of a whole 2-storey (to be) newly constructed office building. I wonder (1) whether we can apply both floors to ID+C rating system or it has to be a single... Last reply: Dave Hubka, Jan 31, 2024, 10:25 am |
|
Blower Door TestingNC-v4.1 EAc1: Enhanced Commissioningposted by Cam Burkacki on Jan 31, 2024, 8:58 am
Hi all, Very simple question here that I can't seem to find a straight answer on. Wondering whether blower door testing is a requirement for the envelope comissioning process, or whether... |