Topic | Recent |
---|---|
Underground ParkingEBOM-2009 SSc7.1: Heat island effect - nonroofposted by Drew Wenzel on Aug 2, 2010, 4:50 pm
I'm working on a project where about 75% of our parking is located under the building itself. The LEED manual says there is "no... Last reply: Jacob Arlein, Aug 20, 2010, 5:57 pm |
|
Re-calibration & corrective actionNC-2009 EAc5: Measurement and Verificationposted by Jenny Stadelmann on Aug 20, 2010, 2:27 pm
Does the re-calibration of the as-built design energy model and the baseline model need to be done monthly during the 12 mos. M&V period, and then corrective action taken monthly based on how... Last reply: Marcus Sheffer, Aug 20, 2010, 3:15 pm |
|
restaurant equipmentCS-2009 EAp2: Minimum Energy Performanceposted by Diana Wellenbrink on Aug 18, 2010, 11:14 pm
Should future restaurant equipment be enluded in the calcs? Last reply: Marcus Sheffer, Aug 20, 2010, 3:08 pm |
|
open space requirementNC-2009 SSc5.2: Site development - maximize open spaceposted by Matthew VanSweden on Aug 19, 2010, 11:50 am
in a... Last reply: David Posada, Aug 20, 2010, 2:25 pm |
|
Lighting and Equipment controlled by BMSCS-2009 EAp2: Minimum Energy Performanceposted by Diana Wellenbrink on Aug 18, 2010, 11:19 pm
What is the corret way of calculating lighting and equipment controlled by Building Management System? Last reply: Marcus Sheffer, Aug 20, 2010, 2:20 pm |
|
Roof space under the perforated panelCS-2009 SSc7.2: Heat island effect - roofposted by Grace Ming on Aug 17, 2010, 11:43 pm
Hello all, Above the concrete roof of the project, there are the steel... Last reply: Mara Baum, Aug 20, 2010, 1:53 pm |
|
Bank Entrance Separate from Building EntranceEBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source controlposted by Chris Munn on Jul 1, 2010, 1:01 pm
I am working with a builidng that has a main entrance into the building with 10 feet of matting, however they have a first floor tenant that is a bank with its own independent entryway from the... Last reply: John Beeson, Aug 20, 2010, 1:01 pm |
|
I-BEAMEBOM-2009 IEQc1.1: Indoor air quality best management practices - indoor air quality management programposted by Michael Chermak on Jul 20, 2010, 5:48 pm
This is an interesting credit point with little information besides a reference to the EPA I-BEAM. There seems to be a wide range of responses to the challenges set forth in obtaining this credit... Last reply: John Beeson, Aug 20, 2010, 12:35 pm |
|
62.1 app for iPhone/iPad usersNC-2009 IEQp1: Minimum indoor air quality performanceposted by Shillpa Singh on Aug 20, 2010, 11:00 am
ASHRAE released an app for iPhone, iPod touch, and iPad that allows you to perform comprehensive minimum ventilation calculations for a wide variety of commercial buildings based upon Standard 62... |
|
LEED 2009 vs. 2.2NC-2009 IEQc8.1: Daylight and views - daylightposted by Anne Marie Kuban on Mar 19, 2010, 8:13 pm
So I have a room of 300SF with a window area (above the 30"zone) of Last reply: Jill Perry, PE, Aug 20, 2010, 10:54 am |