Log in
Forum
Topic

Pilot Credit 5 & 6

Pilot-Credits PC6: Integrative Project Planning & Design
posted by Jill DeMarotta on Aug 6, 2010, 4:02 pm

Has anyone finished with the Pilot Credit 5&6? Was your credit accepted?

Last reply: Jill DeMarotta, Sep 30, 2010, 3:32 pm

Re: Audit Requirements

General forums
posted by David Posada on Sep 30, 2010, 2:37 pm

The LEED review process has moved away from auditing selected credits in greater detail as was practiced under NC 2.1. The LEED Review teams continue to ask for clarifications as part of the...

Common area toilets

CI-2009 WEp1: Water Use Reduction
posted by William Stangeland on Oct 14, 2009, 1:09 pm

Requiring tenants to include...

Last reply: Karen Blust, Sep 30, 2010, 12:32 pm

Local zoning requirements

CS-2009 SSc5.2: Site development - maximize open space
posted by javier bolanos zeledon on Sep 26, 2010, 3:51 pm

On CS V2.0.
According to my Country's local zoning requirements, you should build a maximum of 70% of the total land, but if you have pervious paving you can count that as open space. So...

Last reply: javier bolanos zeledon, Sep 30, 2010, 12:03 pm

Permanent Metering of Sub-Systems- Option 1 / D

Schools-2009 EAc5: Measurement and Verification
posted by Doug Pierce, AIA on Sep 27, 2010, 8:22 pm

We have a debate going in our office about whether Sub-Meters are required (or Not) for the Option D - Whole Systems Simulation method. In LEED NC V2.1, sub-meters were explicitly required, but...

Last reply: Doug Pierce, AIA, Sep 30, 2010, 11:40 am

Time Set Point Not Met Tolerance- Radiant Floor Heating System

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Sep 29, 2010, 2:25 am

Time Set Point Not Met Tolerance is 0.2°C ( ... DOE had specified a tolerance of +-0.5F for this...energyplus has a default of 0.2 degC). Am I justified in relaxing this tolerance on a system...

Last reply: Michael Tillou, Sep 30, 2010, 10:24 am

Special Circumstances

Living with LEED Online - quirks, bugs and hiccups
posted by Cara Mae Cirignano on Sep 30, 2010, 10:22 am

Hi Jean -
Information in the special circumstances section is never required - so it shouldn't affect whether or not Y appears. If you check the 'special circumstances' box, however, the...

WEp1 LEED Online form

General forums
posted by Tristan Roberts on Sep 29, 2010, 10:52 pm

In the WEp1 form, the Pl3 numbers are shown, but then you can enter your own numbers that may reflect more specific project conditions, like yours.
The following note appears in the LEED...

demonstrating compliance

General forums
posted by Tristan Roberts on Sep 29, 2010, 10:41 pm

I would agree that you can demonstrate compliance with those credits for just the one occupied space.

LEED LCA Calculator Questions and Observations

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Dirk Kestner on Sep 23, 2010, 6:47 pm

I just finished importing my data from the EC into the online LEED LCA Credit calculator and have a few questions and observations that might be helpful for others pursuing the credit.

Q1...

Last reply: Whit Faulconer, Sep 29, 2010, 12:43 pm