Log in
Forum
Topic

Transfer data to LEED online?

Schools-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Nicole Cavanaugh on Sep 28, 2010, 10:28 am

How do we go about transferring the data from the provided LEED template to the online form? (Assuming there is an easier way than re-entering all the info? )

Thanks for your help!

Last reply: Tristan Roberts, Sep 28, 2010, 10:56 am

How do you calculate Transient visitors?

CS-2009 WEc3: Water Use Reduction
posted by Kathy Caswell on Sep 28, 2010, 7:58 am

I can not figure out how to calculate this for a core and shell office building that is 3/4 leased.

Last reply: Tristan Roberts, Sep 28, 2010, 8:25 am

Interior lighting for residential project

NC-2009 SSc8: Light Pollution Reduction
posted by Deborah Spira on Sep 28, 2010, 8:22 am

Hi all, I am working on a residential multi-dwelling building. For a residential building it is impossible to control or decide the interior lighting for the apartments. Is this credit therefore...

Runoff volumes

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Gregory Hurst on Sep 21, 2009, 6:50 pm

The key for volume calculation is knowing the 1 and 2-year, 24 hour storm depth. This is calculated fordifferent locations and it is a long process and it is not the same as calculating runoff...

Last reply: Jean Marais, Sep 28, 2010, 2:53 am

Packaged terminal heat pumps

NC-2009 EAc1: Optimize Energy Performance
posted by V. Miller on Sep 23, 2010, 3:45 am

Does anybody know why the baseline COP's for Packaged Terminal HVAC equipment (HVAC systems 1-2 for residential) are less for larger capacities and lower for smaller capacities i.e. Using the...

Last reply: Michael Tillou, Sep 27, 2010, 10:28 pm

Heat Recovery in Baseline Model

NC-2009 EAc1: Optimize Energy Performance
posted by V. Miller on Sep 23, 2010, 6:18 am

Does anyone know what the official line is on baseline heat recovery is for constant volume HVAC systems with more than 5000cfm?

ASHRAE 90.1 G3.1.2.10 Exhaust Air Energy Recovery states...

Last reply: Michael Tillou, Sep 27, 2010, 10:12 pm

Glare Control for CS project

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Michelle Raigosa on Sep 18, 2010, 9:34 pm

Has anyone had any luck requiring the tenant to provide interior shading devices (interior blinds or shades) in order to achieve this requirement of the credit? I have a...

Last reply: Eddy Santosa, Sep 24, 2010, 6:24 pm

Anti-termite Treatment

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Keerthi Ratnayake on Sep 24, 2010, 12:49 pm

Is there any ruling in LEED related to this activity which generally happens once the sub-...

Last reply: Allison Beer McKenzie, Sep 24, 2010, 1:54 pm

Life Support Systems factored in to EAp2 or EAc1?

NC-2009 EAp2: Minimum Energy Performance
posted by Lance Collins on Sep 23, 2010, 4:14 pm

How should projects that feature life-support systems for medical purposes account for their energy loads to comply with the prerequisite? These are 24/7 systems that also require redundancy so...

Last reply: Marcus Sheffer, Sep 24, 2010, 1:49 pm

Base element vs fixture, furniture and FF&E

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Vivian Wan on Jun 29, 2010, 10:51 pm

Is there any solid definition for base elements and fixture/furniture/FF&E? Are Acoustic Panel, Timber Veneer, Plastic Laminate to Wall and movable openable wall panel defined as base...

Last reply: Tristan Roberts, Sep 24, 2010, 9:13 am