Log in
Forum
Topic

CS 2009 EAc1: Optimize Energy Performance

CS-2009 EAc1: Optimize Energy Performance
posted by eileen hughes on Nov 11, 2010, 4:44 pm

My project is currently under Design Review for CS 2009, Design Reviewer has not been assigned yet so I cannot direct message directly to the Reviewer at the moment.
General Contractor...

Last reply: Marcus Sheffer, Nov 11, 2010, 5:08 pm

Portables as diverted waste

Schools-2009 MRc2: Construction Waste Management
posted by Lisa Logan on Nov 10, 2010, 5:33 pm

Valerie,

It turns out that the portables were shown on the drawings and in the specs "to be demolished". During bidding the GCs went to great lengths to find homes for them - which...

Last reply: Valerie Walsh, Nov 11, 2010, 1:09 pm

Mercury Content

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Richard Navarro on Jul 7, 2010, 12:54 pm

Hi I was wondering what you are supposed to do if the manufacturer spec sheet has the number for picograms of mercury per mean lumen hour, but not the number for the amount of mercury content....

Last reply: Bill Swanson, Nov 11, 2010, 8:09 am

Mechanical/HVAC Engineer sign-off

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Janna Nash on Feb 3, 2010, 9:50 pm

Could somebody tell me which...

Last reply: Avkash Patel, Nov 10, 2010, 5:24 pm

LEED O+M 2009 vs LEED O+M 2012

General forums
posted by Avkash Patel on Nov 9, 2010, 2:35 pm

Great Analysis of the two rating systems. I am a LEED AP O+M and for my own knowledge I will be analyzing the 2009 LEED O+M system with the proposed 2012 LEED O+M system. If anyone is interested...

Last reply: Avkash Patel, Nov 10, 2010, 3:38 pm

LPD and Hospitals

CI-2009 EAp2: Minimum Energy Performance
posted by Neil Rosen on Nov 10, 2010, 10:56 am

How do I document exam lighting and the like which is excluded by ASHRAE?

Last reply: Paul Conrad, Nov 10, 2010, 2:17 pm

Commissioning of On-Site Renewable Energy Systems

NC-2009 EAc3: Enhanced Commissioning
posted by Lauren Sparandara on Oct 21, 2010, 4:03 pm

Today we received a clarification request for our Commissioning credit because our PV system has not yet been commissioned at the time of our submission. Our PV system has not yet been...

Last reply: Lauren Sparandara, Nov 10, 2010, 1:59 pm

Credit "Optimize Energy Performance" in Appeal Phase

CS-2009 EAc1: Optimize Energy Performance
posted by Florian Schmidtchen on Nov 10, 2010, 2:57 am

We are managing the certification of an office building according LEED C&S 2009. Due to contractual reasons, the building owner has to reach LEED silver to sell the building to his client....

Last reply: Marcus Sheffer, Nov 10, 2010, 9:04 am

How Sophisticated Should Functional Tests Be?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Omer Moltay on Sep 5, 2010, 6:22 am

Dear All,

Our...

Last reply: Al Tibbs, Nov 10, 2010, 8:36 am

maintenance equipment

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Rachael McClain on Nov 9, 2010, 1:19 pm

I just wanted to clarify the requirements of the maintenance equipment because looking at the template is confusing me. Do I meet requirements if I have five pieces of equipment and one of those...

Last reply: Jason Franken, Nov 9, 2010, 7:11 pm