Topic | Recent |
---|---|
CS 2009 EAc1: Optimize Energy PerformanceCS-2009 EAc1: Optimize Energy Performanceposted by eileen hughes on Nov 11, 2010, 4:44 pm
My project is currently under Design Review for CS 2009, Design Reviewer has not been assigned yet so I cannot direct message directly to the Reviewer at the moment. Last reply: Marcus Sheffer, Nov 11, 2010, 5:08 pm |
|
Portables as diverted wasteSchools-2009 MRc2: Construction Waste Managementposted by Lisa Logan on Nov 10, 2010, 5:33 pm
Valerie, It turns out that the portables were shown on the drawings and in the specs "to be demolished". During bidding the GCs went to great lengths to find homes for them - which... Last reply: Valerie Walsh, Nov 11, 2010, 1:09 pm |
|
Mercury ContentEBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lampsposted by Richard Navarro on Jul 7, 2010, 12:54 pm
Hi I was wondering what you are supposed to do if the manufacturer spec sheet has the number for picograms of mercury per mean lumen hour, but not the number for the amount of mercury content.... Last reply: Bill Swanson, Nov 11, 2010, 8:09 am |
|
Mechanical/HVAC Engineer sign-offEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Janna Nash on Feb 3, 2010, 9:50 pm
Could somebody tell me which... Last reply: Avkash Patel, Nov 10, 2010, 5:24 pm |
|
LEED O+M 2009 vs LEED O+M 2012General forumsposted by Avkash Patel on Nov 9, 2010, 2:35 pm
Great Analysis of the two rating systems. I am a LEED AP O+M and for my own knowledge I will be analyzing the 2009 LEED O+M system with the proposed 2012 LEED O+M system. If anyone is interested... Last reply: Avkash Patel, Nov 10, 2010, 3:38 pm |
|
LPD and HospitalsCI-2009 EAp2: Minimum Energy Performanceposted by Neil Rosen on Nov 10, 2010, 10:56 am
How do I document exam lighting and the like which is excluded by ASHRAE? Last reply: Paul Conrad, Nov 10, 2010, 2:17 pm |
|
Commissioning of On-Site Renewable Energy SystemsNC-2009 EAc3: Enhanced Commissioningposted by Lauren Sparandara on Oct 21, 2010, 4:03 pm
Today we received a clarification request for our Commissioning credit because our PV system has not yet been commissioned at the time of our submission. Our PV system has not yet been... Last reply: Lauren Sparandara, Nov 10, 2010, 1:59 pm |
|
Credit "Optimize Energy Performance" in Appeal PhaseCS-2009 EAc1: Optimize Energy Performanceposted by Florian Schmidtchen on Nov 10, 2010, 2:57 am
We are managing the certification of an office building according LEED C&S 2009. Due to contractual reasons, the building owner has to reach LEED silver to sell the building to his client.... Last reply: Marcus Sheffer, Nov 10, 2010, 9:04 am |
|
How Sophisticated Should Functional Tests Be?NC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Omer Moltay on Sep 5, 2010, 6:22 am
Dear All, Our... Last reply: Al Tibbs, Nov 10, 2010, 8:36 am |
|
maintenance equipmentEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Rachael McClain on Nov 9, 2010, 1:19 pm
I just wanted to clarify the requirements of the maintenance equipment because looking at the template is confusing me. Do I meet requirements if I have five pieces of equipment and one of those... Last reply: Jason Franken, Nov 9, 2010, 7:11 pm |