Can renewable energy sold at a premium rate be applied to EAc1?NC-2009 EAc1: Optimize Energy Performanceposted by Rachel Cook on Dec 3, 2010, 4:40 pm
Although the LEEDUser information for EAc2 is very clear that any... Last reply: Christopher Schaffner, Jan 10, 2011, 7:31 pm |
|
ASHRAE 90.1-2007-G3.1.2.4 fan system operationNC-2009 EAc1: Optimize Energy Performanceposted by Tarek Dalati on Nov 17, 2010, 5:42 am
it s clearly mentioned in this section that the baseline building supply and return fans shall operate continuously whenever spaces are occupied and shall be cycled to meet heating and cooling... Last reply: Christopher Schaffner, Jan 10, 2011, 7:30 pm |
|
FTE for multiple shifts with different start time & end timeCI-2009 SSc3.2: Alternative transportation - bicycle storage and changing roomsposted by Suraj Shah on Jan 5, 2011, 6:27 am
There are different departments with each having multiple shifts, each of the shifts having different start time & end time. (For example, department A has 3 shifts with 1st shift time of 6... Last reply: Tristan Roberts, Jan 10, 2011, 7:10 pm |
|
Defer to Construction Submittal?Schools-2009 SSc9: Site Master Planposted by Greg Hackett on Dec 13, 2010, 10:11 am
Do you need to defer this credit until the construction submittal if SSc7.1 is one of your 4 master plan credits? Thanks. Last reply: Tristan Roberts, Jan 10, 2011, 7:05 pm |
|
WEc3 and water catchmentSchools-2009 WEc3: Water Use Reductionposted by Kaui Lucas on Jan 7, 2011, 10:48 pm
WEc3 This project is the renovation of a government facility. The RFP states that the project will not be LEED registered, or attempt any particular point count. It does ask for... Last reply: Tristan Roberts, Jan 10, 2011, 7:03 pm |
|
Undeveloped siteCS-2009 SSp1: Construction Activity Pollution Preventionposted by Edwin Wealend on Jan 3, 2011, 4:18 am
Does this Credit have to be applied to works during the "site enabling stage" for an undeveloped site? Site investigation Last reply: Tristan Roberts, Jan 10, 2011, 7:01 pm |
|
Infiltration, or Separate fresh air duct?Schools-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on Nov 26, 2010, 7:25 am
Dear all, I have an office room located inside a gymnasium space. The gymnasium is conditioned by an... Last reply: Roger Chang, Jan 10, 2011, 6:47 pm |
|
Battery StorageNC-2009 EAp2: Minimum Energy Performanceposted by Annette Bellafiore on Dec 14, 2010, 3:15 pm
We are working on a project that will have an on-site battery storage system that collects energy from a rooftop solar array. The building is also connected to the grid. Has anyone had experience... Last reply: Tristan Roberts, Jan 10, 2011, 6:42 pm |
|
Target Finder outside the USNC-2009 EAp2: Minimum Energy Performanceposted by Alicia Villanueva on Jan 5, 2011, 9:11 am
We are working on several LEED projects in Mexico and we were wondering if there is an alternative to using the energystar website to complet the target finder in the form. We are using whole... Last reply: Tristan Roberts, Jan 10, 2011, 6:35 pm |
|
EAp2 Option 1 Whole Energy Simulation- % of improvementNC-2009 EAp2: Minimum Energy Performanceposted by Mary Frances Stotler on Jan 4, 2011, 10:57 am
Hi, Wehre working on a project that will consist of a new 310,000 industrial facility attached to an existing 150,000 warehouse. Based on EAp2 new percentages for energy improvements are... Last reply: Tristan Roberts, Jan 10, 2011, 6:30 pm |