Topic | Recent |
---|---|
Owner as required signatorySchools-2009 IEQc7.2: Thermal comfort - verificationposted by Kathleen Lawson on May 9, 2011, 10:04 am
Was the Owner the required signatory in Schools 2007? Submitting final documentation now under that version, have been made aware of the Owner's proceedure for surveying and implementing... Last reply: Tristan Roberts, May 19, 2011, 4:06 pm |
|
Annual building energy determinationSchools-2009 EAc2: On-Site Renewable Energyposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 16, 2011, 8:24 am
Does this credit require the sum of ALL energy uses (electricity, gas, etc.) for the proposed building be the basis for determining the... Last reply: Tristan Roberts, May 19, 2011, 3:51 pm |
|
Concrete Block FillerNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Dan Dokken on Feb 28, 2011, 5:37 pm
In reference to the addendum for Table 1 IEQc4.2 Applicable... Last reply: Josh Jacobs, May 19, 2011, 3:40 pm |
|
VOC Excluding Exempt and Including ExemptCI-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Alan Bernstein on May 18, 2011, 2:05 pm
I have two products that were used on our project. A primer and paint. The cut sheets from Manufacturer state the... Last reply: John Drigot, May 19, 2011, 11:25 am |
|
C&S scopeCS-2009 IEQp1: Minimum indoor air quality performanceposted by Rubén M. R. on May 12, 2011, 6:15 pm
We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors. Last reply: Susann Geithner, May 19, 2011, 11:14 am |
|
Operable WindowsCS-2009 IEQp1: Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on May 18, 2011, 6:25 pm
We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.... Last reply: David Posada, May 18, 2011, 7:30 pm |
|
Existing refueling stationNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Maura Adams on Feb 9, 2011, 11:12 am
We have a refueling station on our campus from a previous LEED project. It's about 1/4 mile from the new building and there's a walking path between the two parking areas. Do you think this would... Last reply: Susan Walter, May 18, 2011, 5:47 pm |
|
Donation of existing furnitureNC-2009 MRc2: Construction Waste Managementposted by Ron Frank on Sep 22, 2010, 12:37 am
We donated from our project in San Francisco a lot of used furniture to schools and Fire Department that avoided going to Land Fill sites. Can we utilize this against percentage for MRc2 for... Last reply: Renee Shirey, May 18, 2011, 5:01 pm |
|
MPR 2NC-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on May 5, 2011, 10:23 pm
According to MPR 2, buildings should be constructed on already existing land. On the supplemental guide it states that cantilevered buildings over water, highways, etc, are acceptable. So it is... Last reply: javier bolanos zeledon, May 18, 2011, 12:55 pm |
|
Documentation requirements?Schools-2009 IEQp1: Minimum indoor air quality performanceposted by Tommy Linstroth on May 28, 2010, 10:08 amBadger LEEDuser Expert 126 thumbs up May 18, 2011- 11:07 am We contacted GBCI and their help forum said we could submit our own spreadsheets. We did so in our design review response (after they initially... Last reply: Tommy Linstroth, May 18, 2011, 11:07 am |