Log in
Forum
Topic

IDA ICE- energy simulations

CS-2009 EAc1: Optimize Energy Performance
posted by Alicja Bieszyńska on Jun 13, 2011, 5:40 am

Hello:)
In which programs are you doing energy simulations? Did you have some problems with...

Last reply: Marcus Sheffer, Jun 13, 2011, 8:55 am

Facade Lighting

NC-2009 SSc8: Light Pollution Reduction
posted by sompoche sirichote on Jun 12, 2011, 11:38 pm

We are going to provide the LED strip along the vertical line of the building facade.
If we assume that the 50% of their lumen is above 90 degree from nadir then our bldg. will exceed the...

What to include for Division 12 products?

CI-2009 MRc4: Recycled Content
posted by Louise Schlatter on Jun 9, 2011, 4:15 pm

I am trying to calculate the total cost for CSI 2004 Division 12 products on my project. The owner has purchased many pieces of furniture, furnishings and miscellaneous items. At this point, I'm...

Last reply: Susan Walter, Jun 10, 2011, 3:44 pm

Deviation from Default TSS Removal Efficiency

NC-2009 SSc6.2: Stormwater design - quality control
posted by Richard Gifaldi (Team Leader) on Apr 18, 2011, 9:36 am

I am working on a project in Germany that is using multiple buffer strips to remove...

Last reply: Juan Robles, Jun 10, 2011, 3:38 pm

IEQp1 and 62MZCalc

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Taylor Ralph on May 12, 2011, 6:34 pm

In a project's IEQp1 we want to use a non-default value for occupancy of a Conference Room (a Critical Zone). My question is, can we use the 62MZ Calculator to show that that area has adequate OA...

Last reply: Roger Chang, Jun 9, 2011, 4:00 pm

Help with Documentation

NC-2009 IEQc7.1: Thermal comfort - design
posted by Maya Karkour on Apr 14, 2011, 3:38 am

Dear all,

1) Thanks to LEED User for uploading sample documentation. This was very helpful.

2) the M&E working on the project would like to demonstrate compliance using a...

Last reply: Christopher Schaffner, Jun 9, 2011, 2:35 pm

safe, all-weather route??

Pilot-Credits PC13: Bicycle Network, Storage, and Changing Rooms
posted by Christine Teichert on Jun 7, 2011, 1:36 pm

what exactly constitutes a safe, all-weather route between the building entry and the network? We submitted this credit in our design review and for our clarifications we were asked to "provide...

Last reply: Chris Marshall, Jun 9, 2011, 12:57 pm

Paper with no recycled Content

EBOM-2009 MRc1: Sustainable purchasing - ongoing consumables
posted by Austin Evans on Jun 9, 2011, 10:52 am

Currently the paper supply that is used in the facility is from a Contract that Corporate has with Staples for copy paper. The copy paper cotnains no recycled in it and a large amount of money is...

Last reply: Tristan Roberts, Jun 9, 2011, 11:45 am

LPD Building Facades with some LED lights

NC-2009 SSc8: Light Pollution Reduction
posted by Norma Lehman on Jun 9, 2011, 10:12 am

It looks as though building facade lighting is a non-tradable surface, but our LED facade lighting is exceeding the...

The lease document is not in English

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by Aaron Levey on Jun 9, 2011, 9:01 am

We have a 10-year lease but it is not in English. Do we have to translate the entire document? Thank you.

Last reply: Susann Geithner, Jun 9, 2011, 9:30 am