filling out the space usage type tableGeneral forumsposted by Cara Mae Cirignano on Apr 26, 2010, 6:33 pmYou could have one row to represent all your classrooms, a second to represent all group learning spaces needing daylight such as cafeteria, gym, kitchen (see the EQc8 forum for discussions on why those... Last reply: Eri Spaulding, Jul 5, 2011, 4:31 pm |
|
Absorption Chiller- District HeatingEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ralf Lehmann on Jul 1, 2011, 3:58 am
In my project there is an absorption chiller supplied by district heating. The building itself is also heated by district heating. The two district heat quantities (one for heating, one for... Last reply: David Eldridge, Jul 5, 2011, 2:47 pm |
|
Compliance of Clay tilesNC-2009 SSc7.2: Heat island effect - roofposted by Udana Ratnayake on Jul 4, 2011, 12:16 pm
We are working on a Hotel project in Sri Lanka and planning to obtain LEED certification for the facility. Hotel is to be constructed as chalets and the project team has decided to use red color... Last reply: Louise Schlatter, Jul 5, 2011, 1:54 pm |
|
Shading from trees planted on roofNC-2009 SSc7.2: Heat island effect - roofposted by Rob Hink on Jun 29, 2011, 2:56 pm
We are designing a building with a "garden lounge" on the roof. The roof will have 3 large canopy trees that will shade a significant portion of the roof. The project is in South Florida so the... Last reply: Susann Geithner, Jul 5, 2011, 1:20 pm |
|
Clarification for credit applicationPilot-Credits PC27: Reconcile Designed and Actual Energy Performanceposted by monu goyal on Jun 30, 2011, 2:11 am
hii, We are doing LEED - CI project, I am getting what should I submit at design stage, I can submit copy of contract, google survey and a draft M&V plan. Is this will meet the credit... Last reply: Marcus Sheffer, Jul 2, 2011, 9:32 am |
|
More LCA Score QuestionsPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dirk Kestner on Jul 1, 2011, 1:11 pm
Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100. I think that some units are off between what EC outputs and... |
|
Epoxy FlooringNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Lauren Sparandara on Aug 23, 2010, 7:18 pm
Hey Mara (or others), I have a lot of projects that have been asking me about epoxy flooring and recently also received a question about epoxy flooring under EQc4.3 on LEEDuser.com. I don'... Last reply: Sylvia Schwartz, Jul 1, 2011, 11:17 am |
|
Demand-Controlled VentilationCS-2009 EAc1: Optimize Energy Performanceposted by Redy Truccolo on Jun 30, 2011, 12:22 pm
Hi, in my proposed HVAC system I want to use a demand-controlled outdoor air ventilation (with motorized dampers controlled by... Last reply: Marcus Sheffer, Jul 1, 2011, 10:56 am |
|
Consider footnoting Table of Required Signatories in LOv3General forumsposted by RETIRED on Jun 30, 2011, 6:09 pm
I think Owner Required Signatories is a great addition for many of the prerequisites and credits where it is used. It has been a breath of fresh air to get owners on board with the requirements.... |
|
LEED Commissioning vs. "Total Building Commissioning" (TBCx)NC-2009 EAc3: Enhanced Commissioningposted by Matt Nolan on Jun 3, 2011, 6:41 pm
I am seeing more and more project requirements (for new buildings) mentioning TBCx (Total Building Commissioning)- which is based on ASHRAE Guideline 0. I'm not real familiar with it, and don't... Last reply: Gary Shlifer MS, LEED AP BD+C, Homes, Jun 30, 2011, 12:01 pm |