Log in
Forum
Topic

Future Tenant Improvements in a LEED NC Project

NC-2009 WEp1: Water Use Reduction
posted by James Del Monaco on Feb 24, 2012, 3:40 pm

I have a Student Union project which has spaces ranging from offices to classrooms to theatres. A majority of the spaces are being built out at this time, however, we have a few small spaces...

Last reply: Michelle Rosenberger, Mar 28, 2012, 1:27 pm

Existing Computers/ New Computers

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Dominique Arrieta on Mar 28, 2012, 11:10 am

We have a renovation project at a college where we have a large number of existing computers, monitors and printers that were excluded from the ENERGY STAR calculations. After the review, LEED...

Last reply: Samantha Harrell, Mar 28, 2012, 12:13 pm

Other low emission certifications

CS-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Mathilda Jonsson on Mar 28, 2012, 7:16 am

Hi all!
My projects is located in Sweden and therefore many of the flooring products is manufracted here. All of the flooring system are low emission tested and have shown really good...

Last reply: Lauren Sparandara, Mar 28, 2012, 11:40 am

Dwelling Units with VRF HVAC system

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Katherine Ann Resurreccion on Mar 12, 2012, 6:07 am

Hi everyone. Im working on a high rise residential building with VRF system in each unit, located in climate zone 1 so heating is not applicable. Can we apply the natural ventilation (4% of the...

Last reply: Paula Hernandez, Mar 28, 2012, 10:28 am

OA requirement for convient store

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Jorng-ren Chern on Mar 14, 2012, 12:23 am

Currently I am working on a office building project and there is a seven-eleven convient store in the first floor. The HVAC design engineer is not sure which occupancy category in table 6.1 of...

Last reply: Paula Hernandez, Mar 28, 2012, 10:27 am

Design Engineer

CI-2009 EAp2: Minimum Energy Performance
posted by Noriko Nagazumi on Mar 26, 2012, 3:40 am

Lighting system refurbishment, plumbing system refurbishment, rainwater ulilization system installation and purchasing some pieces of Energy Star rated equipment are included within our CI...

Last reply: Marcus Sheffer, Mar 28, 2012, 9:33 am

4" Slab on Grade STC rating

Schools-2009 IEQc9: Enhanced Acoustical Performance
posted by renee jimenez on Mar 27, 2012, 7:31 pm

The first floor of my classrooms are slab on grade which per the LEED template should have an...

Last reply: Daniel Hicks, Mar 28, 2012, 9:11 am

v2009 NC Split Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Francisco Villela on Mar 27, 2012, 4:31 pm

I have just submitted Design Preliminary Review for my project. Since construction will be finished soon and all of our Construction Credits will be ready for submittal in a few weeks, do I have...

Last reply: TODD REED, Mar 28, 2012, 8:16 am

Should we consider Hotel Room Showers?

NC-2009 WEp1: Water Use Reduction
posted by Francisco Sanchez Arroyo on Mar 28, 2012, 5:46 am

Should we have to consider the shower heads of the guest rooms? Our Hansgrohe assistant told us that we should not consider them because a hotel is a commercial building but we want to be...

Last reply: Udana Ratnayake, Mar 28, 2012, 6:04 am

Art built in

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Jaida Anderson-Lozano on Mar 27, 2012, 6:39 am

Our project will have vast amounts of large art installations permanently installed in the building (on the walls, in lobbies, etc).

Would adhesives (or all products that could give off...

Last reply: Jaida Anderson-Lozano, Mar 28, 2012, 4:26 am