Outdoor Air Delivery Monitoring System installed post-occupancy

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Philip Herriges on Aug 23, 2010, 6:22 pm

Our building owner is having a building-wide outdoor air delivery monitoring system installed throughout the building (not just in the LEED-tenant area of our project) but it won't be installed...

Last reply: Dylan Connelly, Sep 22, 2011, 11:24 am

Non-Densely Occupied Spaces Served by Existing AHU

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Michelle Ruda on Sep 20, 2011, 2:33 pm

If you have non-densely occupied spaces served by an existing...

Last reply: Dylan Connelly, Sep 22, 2011, 11:20 am

CI on site Green Power?

CI-2009 EAc4: Green Power
posted by Robin Hurt on Aug 17, 2011, 3:27 pm

Is it possible to install onsite...

Last reply: Tristan Roberts, Sep 22, 2011, 12:53 am

REC vendors for Singapore Project

CI-2009 EAc4: Green Power
posted by Yong Lee Low on Aug 25, 2011, 6:46 am

For our Singapore projects, we need to buy...

Last reply: Lana Malone, Sep 21, 2011, 4:18 pm

Green Power for LEED-CI Retail

CI-2009 EAc4: Green Power
posted by Linda Davisson on Aug 22, 2011, 11:48 am

Can anyone confirm that Green Power is 2 points for LEED-CI Retail instead of 5 points for LEED-CI? That is what the LEED-CI Retail rating system indicates, but it is such a significant...

Last reply: Lana Malone, Sep 21, 2011, 4:17 pm

Who Can Execute an REC Contract with Vendor

NC-2009 EAc6: Green Power
posted by Elliot Powers on Aug 12, 2010, 1:50 am

I haven't found anywhere in the LEED-NC 2009 Ref. Guide that stated which party has to execute the...

Last reply: Marcus Sheffer, Sep 21, 2011, 2:22 pm

Cost to be Excluded in the total proj material costs for MR CR3

NC-2009 MRc3: Materials Reuse
posted by Benjie Herrera on Sep 16, 2011, 8:41 am

I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc. in our overall project materials costs when calculating...

Last reply: Patty Breech, Sep 21, 2011, 12:29 pm

Pilot Credit 44

General forums
posted by Tristan Roberts on Sep 21, 2011, 11:39 am

LEED users may also be interested in knowing about the new Pilot Credit 44: Ergonomics Strategy.
Linda, you would also post your survey information...

rating system and credit

General forums
posted by Tristan Roberts on Sep 6, 2011, 3:20 pm

Glen, please post your question to the MRc2 forum. Thanks. Log in or register to post comments ...

Last reply: Tristan Roberts, Sep 21, 2011, 11:30 am

Too much Window Area (WA)?

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by Rebecca Griffith on Feb 22, 2011, 6:52 pm

Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area? I am using the prescriptive calculation and the spreadsheet from the...

Last reply: TODD REED, Sep 21, 2011, 8:51 am