2004 GSA Report on Cost of LEED

Understanding the Cost of LEED-NC Project Certification
posted by Barbara McCrary on Dec 23, 2010, 3:41 pm

Sayeed Muhammad Principal Consultant Green Building Consultants (S) Pte Ltd LEEDuser Basic Member 8 thumbs up March 21, 2011- 11:27 am Our customer asking us to provide ROI for the LEED. Does any one have an Idea where to get compiled set of Savings for each of the credits. For example the client spent a lot of money to pave the entire site with intelocking blocks. How to calculate savings for this. Is there any publication avaialbel out ther for LEED ROI similar to COST OF LEED. Log in or register to post comments ...

Last reply: Sayeed Muhammad, Mar 21, 2011, 11:27 am

documentation of adjustable flowrates

CS-2009 WEp1: Water Use Reduction
posted by Florian Schmidtchen on Nov 25, 2010, 3:23 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up December 7, 2010- 10:22 pm I think this is unlikely to be accepted, on the basis that the fixture could easily be adjusted to the higher rate by an occupant or maintenance person. Log in or register to post comments Sam Keehn Environmental and Sustainability Manager Energy Management Services, Int. LEEDuser Basic Member 73 thumbs up March 3, 2011- 3:24 am We are running into this issue a lot. Tristan, I appreciate your comment and logically think this is correct but was wondering if anyone had anything...

Last reply: Karen Blust, Mar 21, 2011, 2:03 am

ASHRAE 62 vs. LEED Online

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Jim Newman on Nov 12, 2009, 5:55 pm

fill 2007UM_62MZCalc.xls, if you only input the critical zones cfm, the total System output Vou (line i43) > Vps output (line i42), this last value being calculated by only the critical zones...

Last reply: Julia Weatherby, Mar 18, 2011, 12:59 am

Define "no new parking"- project site is a former parking lot

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Jill Ziegler on Mar 17, 2011, 12:04 pm

My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only. When all is said and done, and when comparing old site map to new, there will be 60 fewer parking spaces. The spots that are retained and fall within the boundary will be redone/moved. Does this count as "no new parking?" SSc4.4 ...

Last reply: David Posada, Mar 17, 2011, 5:05 pm

Water Use Reduction

NC-2009 WEc3: Water Use Reduction
posted by Rick Blackshere on Oct 15, 2010, 11:15 am

not something that LEED gives extra credit for.Think about it from a LEED policy perspective, and how difficult it would be to draw a clear line between projects deserving of extra credit for this kind...

Last reply: Nick _, Mar 16, 2011, 5:01 pm

IT ROOM LOADS

NC-2009 EAc1: Optimize Energy Performance
posted by javier bolanos zeledon on Mar 14, 2011, 5:31 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up March 15, 2011- 11:29 am Sounds like non process to me. This is a bit of a grey area and can be difficult to draw a line. For an IT room it seems like it would be more throuble than it may be worth. Any reason you may want to model it as process? Claiming savings? Under 25%? Log in or register to post comments javier bolanos zeledon LEEDuser Basic Member 243 thumbs up March 15, 2011- 7:04 pm Don't get me wrong, I would love to model it as a non-process load, I just thought it was a process load. Electrical...

Last reply: javier bolanos zeledon, Mar 16, 2011, 2:35 pm

LEED for NC or LEED for Homes?

LEED Rating System Selection
posted by Jennifer Marston on Jan 10, 2011, 2:50 pm

Hello, My question is also about the rating system selection. We are considering LEED certification for a new construction project that will consist of 3 commercial retail spaces on the first floor and 9 condominium units total on the second and third floors. The lot is zoned commercial and it is in the town business district. Using the rating system selector, it seems that we technically (because of the commercial zoning) could use the NC rating system, but it also seems that if we hire a Homes provider, that the condominiums could be LEED for Homes certified, but what would we do with the commercial area...

Last reply: Ted Bardacke, Mar 16, 2011, 12:24 pm

Does GreenGuard Certified Products Qualify for IEQc4.1-4.2 ?

CI-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Xing Shi on Aug 16, 2010, 9:32 pm

liquid product and gives results as g/l. There is no correlation between both- except if there is absolutely zero VOC content, then nothing can be emitted. But no VOC emissions after 14 days do not tell...

Last reply: Josh Jacobs, Mar 16, 2011, 8:13 am

Deleted

Pilot-Credits SSpc7: Light Pollution Reduction
posted by Bill Swanson on Dec 13, 2010, 9:09 am

It's over complicating a system while glossing over holes. 9) I've been trying to make the case it should be at the neighbor building or building set back line. The property line or opposite curb...

Last reply: Theresa Backhus, Mar 14, 2011, 6:05 pm

"Building Completed 1993 or Later" Tab on Graph

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by April Ambrose on Jan 22, 2010, 12:33 pm

to conduct the fixture inventory and perform the calculations, they could just use Option 2 to show that they meet the prerequisite. In doing so, they would leave a lot of points on the table, but even though...

Last reply: Jason Franken, Mar 14, 2011, 5:40 pm