Post a question or comment
Credit Filters
Minimum Indoor Air Quality
Filter by location
Forum
Topic
Replies
Recent

Are ASHRAE 62.1-2016 exhaust rates strictly mandatory for v4.1 O+M (EQp Minimum IAQ)?

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Johan Sebastian Bolivar Sora  on 

Hello LEEDuser community,

I’m working on the feasibility phase for a LEED v4.1 O+M: Existing Buildings project and ran into a gray area regarding exhaust requirements.

0

Measuring minimum ventilation

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Jinsung Park  on 

Hi everyone, I have a few questions about measuring mechanical ventilation in the existing building.

0

Ventilation strategy in a warehouse area

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Eric Dyer  on 

Hi all,

We'll take natutal ventilation in warehouse area however doesn't meet maximum distance.

0

Reasonable assumption for plenum ceiling

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Omar Elrawy  on 

We have old existing office building where ducted FCU is serving all the spaces.

5
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Wed Oct 23, 2024, 6:12 am
4
Wed Jul 3, 2024, 3:44 am

Fresh Air Requirement

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Pulak Goyal  on 

I have an existing self storage warehouse to be certified under LEED v4.1 O+M Existing Buildings. It has no regular occupants and no regularly occupied spaces. 

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Jul 1, 2024, 11:40 am

Calculator of Minimum Indoor Air Quality performance

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  DORRA Kouka  on 

Hello everyone, I just want to ask if you are fecing the same issue in the calculator of Minimum Indoor Air Quality performance.

2
Tue Jun 11, 2024, 5:05 pm

Minimum Air Requirement

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Pulak Goyal  on 

I have an interior space going for LEED O+M v4.1 Interiors. The building is very old and the drawings of 1 out of 4 floors is not available.

1
Thu May 2, 2024, 11:29 am

Minimum OA Options

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Courtney Mayes  on 

Hello,  I have a site that has a shared OAD for two units.  The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage.  Even with reduced C

1
Sun Feb 25, 2024, 1:14 am

Change of space during performance period

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Pulak Goyal  on 

I have a building going for LEED O+M v4.1 Existing Buildings Certification. 

0