CI-v4 EAc4:Renewable energy productionposted by Kevin Gilleran on
Hi,
My client has access to the following program:
PV installation built and commissioned prior to Occupancy
CI-v4 EAc4:Renewable energy productionposted by Gary Shlifer on
Our project is a 6 story office building, 250,000 sq feet. It is underconstruction.
Wastewater Plant Methane-powered Fuel Cell
CI-v4 EAc4:Renewable energy productionposted by on
I have a project on a campus whose microgrid is in part served by a large fuel cell. The fuel cell is powered by waste methane gas purchased from a nearby wastewater treatment plant.
Selling renewable energy
CI-v4 EAc4:Renewable energy productionposted by Borja Sánchez on
Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building.
Estimate annual energy use of the office outside U.S.
CI-v4 EAc4:Renewable energy productionposted by Ameet AA on
The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.
Double- Counting of Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Bharath Ravuru on
Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Maria Glädt on
See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.
Renewable Energy in CS project
CI-v4 EAc4:Renewable energy productionposted by Sara Johansson on
Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?