Forum quick links
Tenant Neutral Option
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Miriam Ramirez Baumgarten on
Hi, Our project is following the Tenant Neutral option for WEp1c3 because even though the developer is providing all plumbing fixtures, preparations are available in case the upper floors (specul
Treatment plant startup
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Gabriela Hernández Castillo on
Due to the nature of a treatment plant it requires the building to be operating before the treatment plant is functional. Is there any requirement for a maximum of time before the treatment plant
Rainwater for irrigation
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Juan Robles on
We are collecting rainwater and using it for maintenance in the common areas. At the same time, we are achieving a 62% potable water use reduction installing low flush fixtures.
Water Teatment Plant
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Alejandro Alfaro on
Option 2 of this credit requieres to treat 50% of wastewater on-site to tertiary standards.
V4 WEc2 template issues
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Lianne Lami on
Our other online templates are working, but WEc2 seems to not function. we have achieved 76% water use reduction, but the template won't resolve for 2 points? thoughts?
Waste water generation and treated water
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Michael E. Edmonds-Bauer on
Our project has a big treatmet plant that is treating to tertiary standards not only blackwater but also graywater. The form automatically draws from the WEp1 the wastewater calculations consideri
Treatment plant outside the LEED Boundary
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Gabriela Hernández Castillo on
We have a treatment plant that will treat to tertiary standar 100% of our wastewater. This treatment plant has two situations: 1. It will treat other buildings too 2.
Groundwater to achieve this credit
CS-2009 WEc2:Innovative Wastewater Technologiesposted by MKK LEED on
Hi, I wonder if using groundwater pumped away from the building’s basement or foundation to use in flush-toilets and urinals instead of potable water is a way to achieve Water Efficiency Credit 2,