Post a question or comment
Credit Filters
Innovative Wastewater Technologies
Filter by location
Forum
Topic
Replies
Recent

Tenant Neutral Option

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Miriam Ramirez Baumgarten  on 

Hi, Our project is following the Tenant Neutral option for WEp1c3 because even though the developer is providing all plumbing fixtures, preparations are available in case the upper floors (specul

0

Treatment plant startup

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Gabriela Hernández Castillo  on 

Due to the nature of a treatment plant it requires the building to be operating before the treatment plant is functional. Is there any requirement for a maximum of time before the treatment plant

1
Sat Jun 30, 2012, 11:21 pm

Rainwater for irrigation

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Juan Robles  on 

We are collecting rainwater and using it for maintenance in the common areas. At the same time, we are achieving a 62% potable water use reduction installing low flush fixtures.

1
Mon Nov 21, 2011, 5:20 am

Water Teatment Plant

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Alejandro Alfaro  on 

Option 2 of this credit requieres to treat 50% of wastewater on-site to tertiary standards.

1
Sat Jul 26, 2014, 3:58 pm

V4 WEc2 template issues

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Lianne Lami  on 

Our other online templates are working, but WEc2 seems to not function. we have achieved 76% water use reduction, but the template won't resolve for 2 points? thoughts?

1
Mon Nov 4, 2013, 7:06 pm

Waste water generation and treated water

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Michael E. Edmonds-Bauer  on 

Our project has a big treatmet plant that is treating to tertiary standards not only blackwater but also graywater. The form automatically draws from the WEp1 the wastewater calculations consideri

1
Mon Nov 4, 2013, 7:07 pm

Treatment plant outside the LEED Boundary

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Gabriela Hernández Castillo  on 

We have a treatment plant that will treat to tertiary standar 100% of our wastewater. This treatment plant has two situations: 1. It will treat other buildings too 2.

1
Sat Jun 30, 2012, 10:18 pm

Groundwater to achieve this credit

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  MKK LEED  on 

Hi, I wonder if using groundwater pumped away from the building’s basement or foundation to use in flush-toilets and urinals instead of potable water is a way to achieve Water Efficiency Credit 2,

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Dec 16, 2014, 9:07 pm