Vacant Retail Spaces and Materials and Resources Credits
NC-v4.1 MRc4:Material Ingredientsposted by Gabrielle Mote on
I had a clarifying question as we near our final construction submittal for LEED. Our building consists of occupied space for City Hall with 5 retail spaces on the ground floor.
Greenguard Certification Question
NC-v4.1 MRc4:Material Ingredientsposted by Todd Bundren on
My project is a Lab building with labs and offices.
Armstrong Ultima, Optima and Prelude XL
NC-v4.1 MRc4:Material Ingredientsposted by Cam Burkacki on
Hi all,
Looking for some help finding Material Ingredients Option 2 documentation for the following products:
Building Product Disclosure and Optimization required documentation
NC-v4.1 MRc4:Material Ingredientsposted by Marcelo Alencar Pereira on
Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online?
REACH and Global Green Tag certification count for the Optimization
NC-v4.1 MRc4:Material Ingredientsposted by Summer Gorder on
Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects?
Chemical inventory of the product, HPD.
NC-v4.1 MRc4:Material Ingredientsposted by T Ros on
If an HPD inventory includes the following information: "Substances representing 95% of the product weight are reported at 100/1000 ppm threshold and substances representing 5% of the product weigh
3rd Party Verified Manufacturer Inventory & Product Lens?
NC-v4.1 MRc4:Material Ingredientsposted by Katrina Kashinejad on
Hello,
I'm looking for confirmation on what counts as 3rd Party Verification for these two types of Material Ingredient Reports:
HPD Disclosure Threshold
NC-v4.1 MRc4:Material Ingredientsposted by Gretchen Krumm on
LEED manual clearly says that an HPD must report ingredients at or above 0.1% for compliance with Option 1.
Hazardous ingredients
NC-v4.1 MRc4:Material Ingredientsposted by Aleksandra Suchomska on
If a manufacturer provides an inventory of all potentially hazardous ingredients (up to 100ppm) but omits ingredients that pose no risk and does not list them, does the report qualify for Option 1
Product Categories
NC-v4.1 MRc4:Material Ingredientsposted by Christoph Keck on
Hi everyone,
the project I am supporting at the moment is following the alternative international compliance path where we have to meet the 100ppm REACH criteria.
REACH optimization maximum concentration
NC-v4.1 MRc4:Material Ingredientsposted by Pablo Fuentes on
Hi!
Screening Date vs. Publish Date vs. Expiration Date for HPD
NC-v4.1 MRc4:Material Ingredientsposted by James Keohane on
I recently received a rejection comment for an HPD: Reason given - Publication Date (01/25/22) is after the projects construction period ended( 12/01/21). This particular product
Which version of V4.1 should I follow ? Do older versions of V4.1 become obsolete when a newer version is released?
NC-v4.1 MRc4:Material Ingredientsposted by Sara BENLOUBA on
Dear all,
We have a project registered on the V4 version of LEED.
Imperil and Metric units?
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?
MR credids
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design.
Green Circle Certification
NC-v4.1 MRc4:Material Ingredientsposted by Catherine Blakemore on
Can anyone offer some input on Green Circle certified products and how or if they can contribuit to this credit?
Material Ingredient Screening/Action Plan
NC-v4.1 MRc4:Material Ingredientsposted by Brianne Grace on
I'm grasping for one last point here.
Referencing the webinar Materials and Resources dated Jan 28, 2019 - Natural Stone credit taken out
NC-v4.1 MRc4:Material Ingredientsposted by Katherine Teel on
Pilot credit library discussion around EPD and Sourcing Credits - subject matter answering questions at the end - a statement was made that the Natural Stone credit had been taken out. can so
EXCEL sheet "v4.1_Bldg product decalration calculator_v03_updated" - not working
NC-v4.1 MRc4:Material Ingredientsposted by Lise Dannesboe on
Dear All
Option 2 Examples?
NC-v4.1 MRc4:Material Ingredientsposted by SIG - Sustainability Main Account on
We are looking for examples for Option 2 for:
- Material Ingredient Screening and Optimization
- Advanced Inventory & Assessment (HPD or Manufacturer Inventory)
Does Declare count as Third-Party Verified in LEED v4.1?
NC-v4.1 MRc4:Material Ingredientsposted by Adam Stoker on
The following credit language introduced in LEED v4.1 leaves me with some questions regarding Declare labels:
Clarification on Cradle to Cradle eligibility
NC-v4.1 MRc4:Material Ingredientsposted by Allan Robles on
Hi LEEDuser community,
I wanted to confirm my understanding of the distinction between the different option pathways for Cradle to Cradle certificates (bulleted below):
Slag Usage in LEED Projects
NC-v4.1 MRc4:Material Ingredientsposted by Brian Graf on
Hello Everyone!
International Compliance Path
NC-v4.1 MRc4:Material Ingredientsposted by Martha Lewis on
Very curious why both LEED 4 and 4.1 restrict the Candidate List to "the version in effect June 2013"?
Are C2C or C2C MHC automatically considered 3rd party verified?
NC-v4.1 MRc4:Material Ingredientsposted by Tommy Linstroth on
HPDs have a box to check for 3rd party verification. Does Cradle to Cradle in and of itself earn the 3rd party certification? Is it both for C2C and Material Health Certificates?
Post-consumer recycled content vs pre-consumer recycled content - LEED V3 excel datasheet
NC-v4.1 MRc4:Material Ingredientsposted by Mateus Souki on
I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification).
LBC 3.0 Red list compliant
NC-v4.1 MRc4:Material Ingredientsposted by Allen Cornett on
I have 2 products that state they are LBC 3.0 Red list compliant. If these products meet the requirements of the USGBC Declare Compliance Graphic can LBC 3.0 Red list compliant contribut
REACH fulfillment to 1000 ppm / 100 ppm
NC-v4.1 MRc4:Material Ingredientsposted by Alex Parella on
European paints manufacturer only justifies the fulfillment of REACH to 100 ppm, arguing that 1000 ppm level of analysis only suits with gas products.
Declare labels
NC-v4.1 MRc4:Material Ingredientsposted by Susan Di Giulio on
The Reference Guides for both v4 and v4.1 state that: