Log in

Construction Documents

For LEED documentation, the civil engineer needs to fill out the LEED Submittal Template, including the pre-development rate and quantity of stormwater runoff, the post-development rate and quantity, and a stream-protection narrative (as applicable). The

For LEED documentation, the civil engineer needs to fill out the LEED Submittal Template, including the pre-development rate and quantity of stormwater runoff, the post-development rate and quantity, and a stream-protection narrative (as applicable). The civil engineer should also provide a copy of the project plans with designated stormwater strategies. (See Documentation Toolkit for samples.)

If applicable, your M&V plan should specify submetering sensor locations, sensors requiring trending, sampling rates, required energy model outputs, and how measured data will be compared to the energy model. Also include how loads are arranged and gr

If applicable, your M&V plan should specify submetering sensor locations, sensors requiring trending, sampling rates, required energy model outputs, and how measured data will be compared to the energy model. Also include how loads are arranged and grouped in electric panels. (It is best, for example, not to mix power, lighting, and HVAC equipment loads within individual panels.)