When your final design is documented, run a final energy model for LEED documentation. Include the specifications and efficiencies of the system being purchased and installed.
Removing an atrium, for example, due to high cost may provide additional saleable floor area, but may also reduce daylight penetration while increasing the lighting and conditioning loads.
During the budget-estimating phase, the project team may decide to remove some energy-saving strategies that have been identified as high-cost items during the value-engineering process. However, it is very important to help the project team understand that these so-called add-ons are actually integral to the building’s market value and the owner’s goals.
Make sure mechanical spaces and locations are coordinated in the architectural and structural drawings. For example, is a duct run colliding with a beam? Is a fan coil unit placed above a door opening so that it will leak condensate on people walking into the space? Common mistakes like this can cause construction delays and poor performance during operations if not detected, so coordination of the drawings is critical, especially if your project involves integrated design and complex systems.
Energy systems are only as efficient as they are well-installed and operated—involve the operations team during the final Construction Documents phase (or even much earlier) to make sure they are abreast of design decisions and prepared to operate in the sequence required.
Specify and contract for efficiency measures. Often new equipment and novel systems are unknown to contractors, so hold bid and construction meetings to ensure your specifications are understood and everything is purchased and installed as intended.
Assess your compliance with the credit and projected points to be earned. This credit and option can be the largest contributor to your LEED point total, so if you aren’t hitting your goal, consider last minute design changes now.