Log in

 Where applicable, the M&V plan should specify submetering sensor locations. Define the specific sensors with their location and sampling rates. In the plan, define the required energy model output and how measured data will be compared to the en

 Where applicable, the M&V plan should specify submetering sensor locations. Define the specific sensors with their location and sampling rates. In the plan, define the required energy model output and how measured data will be compared to the energy model. Also define how loads are arranged and grouped in electric panels; mixing power, lighting and HVAC equipment loads within individual panels is not recommended. 

Project phase: 
Credit tip type: