Include submittal requirements within each targeted construction spec section and add general requirements to the Division 1 bid package. Include a copy of any submittal documents that the contractor may need to fill out.

Include submittal requirements within each targeted construction spec section and add general requirements to the Division 1 bid package. Include a copy of any submittal documents that the contractor may need to fill out.