Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option 1 Requirements

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Yodi Danusastro  on 

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C.

1
Wed May 15, 2019, 6:13 pm
4
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu May 9, 2019, 8:47 pm

Other Buildings within LEED Boundary

NC-v4 SSc5:Heat island reduction
posted by  Max Krueger  on 

Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.

0

Reverberation Calculations for a Library - Option 2

Schools-NC-v4 EQp3:Minimum acoustic performance
posted by  Gwenedd Murray  on 

We have a library that is roughly 40,000cf which requires us to determine maximum reverberation from NRC-CNRC Construction Technology Update No.

1
Fri Oct 30, 2020, 9:21 pm

Option 2: Inputting Direct and Diffuse Horizontal Irradiance in IES

NC-v4 EQc7:Daylight
posted by     on 

I'm working in IES to evaluate the daylight LEED credit option 2 for a project, and one of the requirements is to input direct and diffuse horizontal irradiance.

0

Whole Building Life Cycle LEED credit

SD Leaders
posted by  Alison Nash  on 

We are working on a Core & Shell project with a developer that we work with frequently.

0

Job Site Construction Office Trailers

SC Leaders
posted by  Conor McGuire  on 

Please use this thread for you're actions / ideas for creating more sustainable job site construction office trailers.

11
Principal
The Beck Group
LEEDuser Basic Member
98 thumbs up
Wed May 8, 2019, 7:13 pm

Heat Island Effect Potential

NC-v4 SSc1:Site assessment
posted by  Samantha Varela  on 

Is there an accurate urban heat island map to utilize for this section of the Site Assessment?

 

0

LCA in accordance with ISO 14071

CS-v4.1 MRc2:Environmental Product Declarations
posted by  Jennifer Pitkanen  on 

Hi,

In MRc2 Option 1, the second bullet under "Life-cycle assessment and environmental product declarations" says:

0

ISO 14001 Certified EMS - Innovation Credit?

NC-v4 INc1:Innovation
posted by  Miguel Rivera  on 

Reposting this question from LEED 2009. Has anyone received guidance on whether this is an acceptable Innovation credit (ISO 14001 Certified EMS) for LEEDv4 projects? 

1
Tue Jun 8, 2021, 6:52 pm