Forum quick links
Invalid Operating Hours
EBOM-v4.1 LTp1:Transportation Performanceposted by Green Projects on
I'm hitting some technical glitches in Arc to get survey results.
grass does not count, so what exactly does "two types of vegetation" mean ?
NC-v4.1 SSc3:Open Spaceposted by Sue Bryant on
We received a review comment stating it is not clear that areas noted as recreatation oriented grass are planted with two or more types of vegetation.
Two additions to school but not connected, should we exclude one...
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Alara Brinton on
I do not have a coach assigned to this project, however I have a question regarding the LEED boundary and MPR interpretation for an addition project.
VOC Content requirement on the Low Emitting Materials calculator
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
We received a product certified under the GEV's EMICODE certification scheme and classified as Ec1plus - very low emissions.
Innovation: Design for active occupants
CI-v4.1 IN101:Innovationposted by Andrea de la Piedra on
Hi, I want to persue the stategy: Innovation: Design for active occupants, inside my project boundary, which is inside a building.
IAQ for Office Return
posted by Ryan Hughes on
I'm curious if anyone can share their strategy on indoor air quality for the return to office.
Air Testing - UVGI
NC-v4 EQc4:Indoor air quality assessmentposted by Francesco Passerini on
Can equipment UVGI (Ultraviolet germicidal irradiation) be used during the test?
Shall that be permantly installed?
Air-handler location
Homes-v4 EQp3:Garage pollutant protectionposted by Aaron McEwin on
Is the requirements intent to place the air handler and ductwork in a closet that does not communicate with the garage?
Adapting the Construction Process for Passive House
posted by Jennifer Zakrzewski on
Hello Green Gurus,
Here is the information for this month's Peer Networks Webinar, Adapting the Construction Process for Passive House. We hope you will join us!