Tenants installing glare control devices

CS-v4 EQc4:Daylight
posted by  Ricardo Sá  on 

According to Reference Guide, manual or automatic (with manual override) glare-control devices shall be provided for all regularly occupied spaces in order to comply with credit requirements.

7
Wed Jun 1, 2022, 1:54 am

Updated Credit Requirements - resubmit or appeal?

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Deborah Lucking  on 

Wondering if anyone has experience with this - we submitted the Credit under the beta version of v4.1 in June 2021, not realizing that the April 2021 version of the Credit has lower thresholds.

4
Associate, Built Ecology
WSP USA
LEEDuser Expert
6 thumbs up
Tue May 31, 2022, 7:59 pm

Use of alternative standards - UK

CI-v4 EQc9:Acoustic performance
posted by  R Jones  on 

Hi - what other standards are allowed as an equivalent to the ASHRAE standard? is the British Council for Offices (BCO) guidance accepted for all parts ?

 

thanks 

0

furniture reused

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Priscillia Champagne  on 

Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk).  For the raw material supply credit, it is sp

1
Tue May 31, 2022, 4:06 pm

MR BPD&O Calculator v4.1 transfer from v4.0

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Harry Flamm  on 

Hi,

Has anyone figured out how to transfer materials data from the v4.0 BPDO calculator into the latest v4.1? Or is it still prevented by USGBC spreadsheet 'security'?

 

1
Wed Jun 1, 2022, 1:05 pm

Metal stops for Tiles

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Cecile de Villemeur  on 

Hello, 

Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks !

0

Emergency generator building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Priscillia Champagne  on 

I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon May 30, 2022, 1:07 pm

New addition with separate air distribution systems also feeding renovation portion of existing hospital

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Priscillia Champagne  on 

We are planning to register a new project for LEED certification, but we need to make sure that we can comply with the minimum program requirement #2 beforehand.