Forum quick links
Tenants installing glare control devices
CS-v4 EQc4:Daylightposted by Ricardo Sá on
According to Reference Guide, manual or automatic (with manual override) glare-control devices shall be provided for all regularly occupied spaces in order to comply with credit requirements.
Updated Credit Requirements - resubmit or appeal?
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Deborah Lucking on
Wondering if anyone has experience with this - we submitted the Credit under the beta version of v4.1 in June 2021, not realizing that the April 2021 version of the Credit has lower thresholds.
Use of alternative standards - UK
CI-v4 EQc9:Acoustic performanceposted by R Jones on
Hi - what other standards are allowed as an equivalent to the ASHRAE standard? is the British Council for Offices (BCO) guidance accepted for all parts ?
thanks
furniture reused
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Priscillia Champagne on
Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk). For the raw material supply credit, it is sp
MR BPD&O Calculator v4.1 transfer from v4.0
NC-v4.1 MRc2:Environmental Product Declarationsposted by Harry Flamm on
Hi,
Has anyone figured out how to transfer materials data from the v4.0 BPDO calculator into the latest v4.1? Or is it still prevented by USGBC spreadsheet 'security'?
Metal stops for Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Cecile de Villemeur on
Hello,
Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks !
Emergency generator building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Priscillia Champagne on
I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).
New addition with separate air distribution systems also feeding renovation portion of existing hospital
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Priscillia Champagne on
We are planning to register a new project for LEED certification, but we need to make sure that we can comply with the minimum program requirement #2 beforehand.
Vinyl committed to sustainable developments Certification
NC-v4.1 EQc2:Low-Emitting Materialsposted by Francesco Lupoi on
Good morning everyone!