Forum quick links
Energy Model
CS-2009 EAc1:Optimize energy performanceposted by Oliver Preuss Hernandez on
Hi, I am about to start to model a Building which includes a Ventilated Facade. But I don't have any idea how to represent it on the simulation program.
Template link to Tier III pesticides not sufficient
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Geoffrey Tomlinson on
FYI, We were just denied the IPM credit using the LEEDuser template because it only included a link to the City of San Francisco’s Hazard Tier 3 least-toxic pesticides.
Parking Capacity
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by VITAL DAFNE on
I am working on a hotel with two separate buildings. Since the parking will be used for the same hotel, the local zoning requirements were met.
Energy Performance after LEED Award
NC-2009 EAp2:Minimum energy performanceposted by Steven Er on
In MPR, all LEED certified project must commit to sharing with USGBC and/or GBCI all available actual whole-project energy data for a period of a least 5 year. I assume building energy performance
Rapidly Renewable Lubricants
NC-2009 MRc6:Rapidly renewable materialsposted by Mike Woodfall on
How does a supplier of elevator hydraulic fluids document and communicate the renewable nature of our products to contractors interested in NC2009 MRc6 credits?
ESC PLAN Language
CS-2009 SSp1:Construction activity pollution preventionposted by Esteban Undurraga on
Dear all, I think this question will be useful for people doing LEED outside the US.. Is it posible to upload the ESC plan in SPANISH? or I have to translate the whole document to English??
U-factor residential/nonresidential
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
I’m modeling a hotel (5 storey, one floor is underground) in which there are also offices, a coffee bar, a wellness center...
Recertification Guidance
posted by Chris Munn on
Is the USGBC ever going to release guidance on recertification? I've been told for over a year and a half now to sit tight, because recertification guidance is on the way.
policy wording
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Jutta Berns on
our review just came back and the reviewers made the following comment: "The economic assessment policy is incomplete, as it does not require that maintenance cost savings be included in the econ