DES Option 2 - Clarification
NC-2009 EAc1:Optimize Energy Performanceposted by FABIO VIERO on
Hi, we are working on a LEED NC 2009 project consisting of an office building, where the thermal energy (heating via hot water) is generated and distributed by means of a municipal grid (about 40 m
PU foam
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Emmanuel Pauwels on
Under what category would a 1-compnent mounting Polyurethane foam fall and consequently what would be the maximum VOC level allowed?
No autosizing of equipment on proposed?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Is there a reason why the equipment on the proposed can not be autosized?
Exhaust Fan Testing in a Laboratory
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alexis Thompson on
I am working on a laboratory project and we are gearing up to perform the exhaust fan testing internally.
What's in return?
posted by Wing Ho on
As far as I know, the cost of $6000 a year is kind of like annual subscription fees for the LDP. After 12 months, you’ve to return the LDP back to USGBC in good shape.
Zero lot line existing building renovation
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Kim Shinn on
This project is a re-skin, and interior re-fit. Complete preservation of the structure. There was no site soil distrubance. What is required for SSp1 documentation?
On-site renewable energy
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! We are trying to offset as much as possible from our electricity consumption with on-site PV.
Sediment Basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it.
Number of features required to be met?
Pilot-Credits EQpc78:Design for active occupantsposted by Crista Shopis on
We have submitted this pilot credit for review, we included documentation for 7 of the 11 features listed in the credit description that qualify as satisfying the credit.