no minimum local zoning regulations
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Adam Targowski on
What if there are no minimum local zoning regulations regarding number of parking spaces? In that case, is it enough to provide preferred places for carpools?
Water Heater
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Izumi Takayama on
We saw discussions for the water heater, but am still not sure if the hot water heater applies to the calculation for this credit. According to the reference book, “The credit applies to all insta
Definition of greenfield site
NC-2009 SSc2:Development Density and Community Connectivityposted by Maria Glädt on
Hi! We have a site in Nairobi which we try to define as a greenfield or previously developed site.
hotel with cottages
posted by Emmanuel Pauwels on
We are looking at a hotel project (BD&C) that consists of a main building and separate cottages.
Perimeter Controls
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Mesquita on
Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).
LEED Boundary / Silt Fencing
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Carrie Laurendine on
Currently working on a project that is a large site with an existing building currently on the site.
SS C7.2 High albedo roof area -120%?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Soo young No on
I have just submitted design submittal. When I calculated the High albedo roof area, it came out to 120%. Can I apply for the examplary credit?
EBOM on Core and Shell (not LEED) building
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by LEED Pro Consultant on
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.
PBE Edifica for EAp2 compliance
CS-2009 EAp2:Minimum Energy Performanceposted by Mauricio Torres on
Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.
Indoor/Outdoor Pool
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tom Liebel on
We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an outdoo