Log in
LEED v2009
Healthcare
Innovation in Design
Integrated project planning and design

LEED CREDIT

Healthcare-v2009 IDc3: Integrated project planning and design 1 point

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Assemble and involve a project team as described in ID Prerequisite 1: Integrated Project Management and Design. Actively involve all team members referenced above in at least three of the following phases of project design and construction process:

  • Conceptual/schematic design
  • LEED planning
  • Preliminary design
  • Energy/envelope systems analysis or design
  • Design development
  • Final design and construction documents
  • Construction administration
Conduct regular meetings with the project team from the end of schematic design until the owner's certificate of occupancy to review project status, introduce new team members to project goals, discuss problems encountered, formulate solutions, review responsibilities and identify next steps. The meetings can be integrated into other required project team meetings. A plan shall be determined for regular integrated team coordination. At a minimum, 12 meetings shall be included with the integrated project team. In these meetings, utilize the framework established by the ANSI Market Transformation to Sustainability Guideline Standard March 2007 revision for distribution Whole System Integration Process (WSIP). See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Assemble and involve a project team as described in ID Prerequisite 1: Integrated Project Management and Design. Actively involve all team members referenced above in at least three of the following phases of project design and construction process:

  • Conceptual/schematic design
  • LEED planning
  • Preliminary design
  • Energy/envelope systems analysis or design
  • Design development
  • Final design and construction documents
  • Construction administration
Conduct regular meetings with the project team from the end of schematic design until the owner's certificate of occupancy to review project status, introduce new team members to project goals, discuss problems encountered, formulate solutions, review responsibilities and identify next steps. The meetings can be integrated into other required project team meetings. A plan shall be determined for regular integrated team coordination. At a minimum, 12 meetings shall be included with the integrated project team. In these meetings, utilize the framework established by the ANSI Market Transformation to Sustainability Guideline Standard March 2007 revision for distribution Whole System Integration Process (WSIP).
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Healthcare-v2009 IDc3