Log in
Forum
Topic

Calculating views with casework in the room

NC-2009 IEQc8.2: Daylight and views - views
posted by Renee Shirey on May 24, 2011, 11:24 am

In the example (Mt Healthy school) in the Documentation Toolkit section of this credit, the only thing that seems to limit the views is the window locations and the walls. Why is the casework...

Last reply: Renee Shirey, Sep 28, 2011, 3:16 pm

Random Selection of Survey Pool Members

Doing the Alternative Commuting Transportation Survey
posted by James Green on Sep 23, 2011, 5:39 pm

One building's survey pool size was determined to be ~500 out of ~1500 total occupants. Assume survey forms are to delivered to every third person passing into the elevator vestibules (the only...

Last reply: Dan Ackerstein, Sep 28, 2011, 1:00 pm

Exemplary Performance- forms question

NC-2009 MRc2: Construction Waste Management
posted by André Knutsson on Sep 19, 2011, 8:09 am

We have finished the project whith a 97.2 % recycling, and are pursuing the one Innovation in Design credit. When we register the IDc1.1 we do not get to choose the MRc2 in the dropdown window...

Last reply: André Knutsson, Sep 28, 2011, 2:40 am

AREA CRITERIA

CS-2009 EAp2: Minimum Energy Performance
posted by RICARDO GUEMEZ DIAZ on Aug 9, 2011, 6:54 pm

HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS. THE CONDITIONED AREA IS 130,000 FT2 WITH 9 LEVELS OF OFFICE...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:15 pm

Building Slabs: not in Developer's scope of work

CS-2009 EAp2: Minimum Energy Performance
posted by LEED Pro Consultant on Jul 5, 2011, 2:09 pm

In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope). It is a 10-story building with 2 glass façades with high-...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:12 pm

Energy Modeling

CS-2009 EAp2: Minimum Energy Performance
posted by Yolanda Sanchez on Jul 11, 2011, 1:39 pm

In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope). It is a 10-story building with 2 glass façades with high-...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:10 pm

Compliance with Appendix G ASHRAE

CS-2009 EAp2: Minimum Energy Performance
posted by Daniela Castro Salgado on Aug 10, 2011, 7:04 pm

We have a 14 storie-152600sft building which we are interested in certifying, however, there are 2 problems:

1. The client does not want a water treatment plant.
2. The client wants...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:02 pm

LEED CS- EAp2 Existing equipment to remain

CS-2009 EAp2: Minimum Energy Performance
posted by BAOQUY VU on Aug 23, 2011, 9:24 am

I have an existing 90,000 SF, 3-story office building in Massachusetts consisting of...

Last reply: Marcus Sheffer, Sep 27, 2011, 9:58 pm

Tenant build-out

CS-2009 EAp2: Minimum Energy Performance
posted by Marco ZM on Aug 29, 2011, 6:34 am

We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent....

Last reply: Marcus Sheffer, Sep 27, 2011, 9:49 pm

Estimating credit acheivement

CS-2009 SSc6.2: Stormwater design - quality control
posted by Amanda Ross on Sep 27, 2011, 7:35 pm

1) Does anyone know of any local/regional programs with the 80% standard in the Vancouver, BC area? Our project is located in Surrey, BC.

My civil engineer tells me that he knows of no...