Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Existing building

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Charalampos Giannikopoulos  on 

When reusing an existing building (major renovation) then only new flooring materials would be applicable for the credit?

2
Tue Mar 31, 2015, 1:10 pm

Air Curtain in conditioned space

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 31, 2015, 1:20 am

Occupancy Proof

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deepika Parmar  on 

What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Mon Mar 30, 2015, 7:09 am

Criteria for Space usage type

NC-2009 PIf3:Occupant and Usage Data
posted by  Alicia Villanueva  on 

How should I select the column "Space Usage Type" for each space. My criteria is to assign the type of space which each particular room serves.

2
Fri Mar 27, 2015, 10:39 pm

C&S Individual Project within a Campus Registration

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

This may be a very simple question, and perhaps our team is looking into this too deeply: We have a campus which we intend to use a Master Site with individual registrations (i.e. not a group).

3
Project Manager, Sustainability
Sol design + consulting
LEEDuser Basic Member
13 thumbs up
Fri Mar 27, 2015, 9:07 pm

Integrated System - Space heating and water heating

NC-2009 EAp2:Minimum Energy Performance
posted by  CT G  on 

We are working in a project that has a gas-fired boiler that supplies hot water for space heating (radiant floor) and domestic hot water. Do we need to comply with efficiencies in tables 6.8.1F an

3
Default Avatar
LEEDuser Premium Member
19 thumbs up
Fri Mar 27, 2015, 6:27 pm

Areas passing at one time but not another

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lisa Fabula  on 

If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Mar 27, 2015, 4:06 pm

Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivan Priatman  on 

Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.

9
Senior Designer
PT. Archimetric
LEEDuser Basic Member
4 thumbs up
Fri Mar 27, 2015, 10:02 am

Minimum Ventilation rates for Production area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  sriram tetali  on 

Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1

3
Manager -Sustainability Services
M W Group
LEEDuser Basic Member
1 thumbs up
Fri Mar 27, 2015, 7:01 am

Hello,
I am documenting this

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Michael Russo  on 

Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 26, 2015, 11:00 pm