Forum quick links
Existing building
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Charalampos Giannikopoulos on
When reusing an existing building (major renovation) then only new flooring materials would be applicable for the credit?
Air Curtain in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?
Occupancy Proof
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Deepika Parmar on
What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project.
Criteria for Space usage type
NC-2009 PIf3:Occupant and Usage Dataposted by Alicia Villanueva on
How should I select the column "Space Usage Type" for each space. My criteria is to assign the type of space which each particular room serves.
C&S Individual Project within a Campus Registration
posted by Nate Steeber on
This may be a very simple question, and perhaps our team is looking into this too deeply: We have a campus which we intend to use a Master Site with individual registrations (i.e. not a group).
Integrated System - Space heating and water heating
NC-2009 EAp2:Minimum Energy Performanceposted by CT G on
We are working in a project that has a gas-fired boiler that supplies hot water for space heating (radiant floor) and domestic hot water. Do we need to comply with efficiencies in tables 6.8.1F an
Areas passing at one time but not another
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lisa Fabula on
If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time.
Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit
NC-2009 EAp2:Minimum Energy Performanceposted by Ivan Priatman on
Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.
Minimum Ventilation rates for Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by sriram tetali on
Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1
Hello,
I am documenting this
NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by Michael Russo on
Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room.