We have currently a LEED NC project of an office building with a data center in the basement. We received the information from the electrical engineer, that the process load of the data center is 190 kW. We believe, that this is the peak load and that the average 24/7 power consumption is far below this value. Does anybody have experience with the relation between peak power and average power of data centers?