Log in
Forum
Topic

non default occupancy numbers

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Veronika Sundberg on Sep 27, 2011, 10:31 am

We want to use non default occupancy values for some rooms in our project. Do anyone have experience what the reviewers might have for thoughts regarding this. We will describe why we don’t use...

Last reply: Susan Walter, Nov 3, 2011, 2:20 pm

Future retail- walk off mat requirements

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Ed Clark on Oct 14, 2011, 5:03 pm

I am working on a multi-family residential project that includes some shell & core future retail space on the ground floor. The client does not want to provide permanent entry systems,...

Last reply: Allison Beer McKenzie, Nov 3, 2011, 2:06 pm

Hi Kay

General forums
posted by Emily Catacchio on Nov 3, 2011, 1:53 pm

This is a difficult question because it really depends on the project. It also depends what your role is. If you're the LEED coordinator for the project you could spend, say 120 hours. If you're...

Re: Documentation hours

General forums
posted by David Posada on Nov 3, 2011, 1:46 pm

There are a few comments posted over at
http://www.leeduser.com/topic/man-hour
so give that a look and post back if you still have...

What can we claim?

NC-2009 IDc1: Innovation in Design
posted by Clare Parry on Oct 19, 2011, 7:37 pm

Hi all,
We have just received our Construction Prelim results and comments. The Assessors don't like our innovation claims at all!!
We claimed: a carbon neutral building - meaning...

Last reply: Becky Balsano, Nov 3, 2011, 12:54 pm

EA Credit 1 Optimize Energy

General forums
posted by Jonathan Weiss on Sep 15, 2011, 9:48 am

I had posted this comment during the first public comment period, but there was not much in the way of response, so I wanted to bounce it off this group for feedback - I am curious about the new...

Last reply: Marcus Sheffer, Nov 3, 2011, 12:06 pm

Designate CXA

NC-2009 EAc3: Enhanced Commissioning
posted by Benjie Herrera on Sep 23, 2011, 4:28 pm

Is the Owner only qualified to designate a CXA?What if the contractor or subcontractor already hire CXA to do the commissionfor the project will that disqualify the proj.from achieving EA Pre1...

Last reply: Peter Dishno, Nov 3, 2011, 11:24 am

Exterior Facade- Lighted Letters- signage

Schools-2009 SSc8: Light Pollution Reduction
posted by Suzanne Allerton on Nov 3, 2011, 10:33 am

Can you clarify the requirements for lighted letters on the
building facade? Thank you for all info available.

Eligibility of directly used groundwater

NC-2009 EAc2: On-Site Renewable Energy
posted by Jens Apel on Jun 3, 2010, 7:45 am

I am working on a European project where groundwater is directly used for space cooling without any vapor compression cycle. The system is approved by he local authorities.
Does anybody...

Last reply: Jens Apel, Nov 3, 2011, 5:28 am

LEED NC or CS? One building or two?

LEED Rating System Selection
posted by David Sheridan on Mar 15, 2011, 6:40 am

My client owns two existing buildings that abut one another. He plans to renovate and add onto both buildings. First floor will be retail - probably separate tenant on either side. Second and...

Last reply: Nathan Lee, Nov 3, 2011, 2:52 am