Log in
Forum
Topic

LEED AP

NC-2009 IDc2: LEED Accredited Professional
posted by TEY SIUNG on Nov 21, 2011, 11:10 am

How to upload my LEED AP certificate to earn the point ?

Last reply: Maria Kutelova, Nov 24, 2011, 3:51 am

EAp2- Design and Buildt Contract

NC-2009 EAp2: Minimum Energy Performance
posted by André Knutsson on Nov 21, 2011, 8:01 am

Consto have a Design and Buildt Contract with the project owner. The Architects contracts is a part of the contract. His role in the project is design and drawing. Building physics is managed...

Last reply: André Knutsson, Nov 24, 2011, 1:20 am

LEED Project Boundary- LEED NCv2.2

General forums
posted by Jennifer Turchin on Nov 22, 2011, 3:48 pm

We have a hotel project that is 23 stories and was started and registered as a LEED NCv2.2 project in 2008. The design phase submittal was completed for the project and then at that time the...

Last reply: Emily Catacchio, Nov 23, 2011, 11:39 pm

MRc5 Metal Stud... Assembly? Reused Furniture Manftr AND Extrxn?

CI-2009 MRc5: Regional Materials
posted by Simon Sue on Nov 17, 2011, 11:20 pm

In review comments recently received by our team for a LEED-CI Retail project, the following portions have confused us:

1. "Products from _____ vendor... have the same extraction and...

Last reply: Emily Catacchio, Nov 23, 2011, 11:02 pm

EBOM IEQp1: Dedicated OA to classroom FCU's

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by James Doyle on Nov 23, 2011, 2:55 pm

For EBOM IEQp1 we...

Last reply: Dylan Connelly, Nov 23, 2011, 7:18 pm

Envelope requirements of ASHRAE 91.1-2007

CI-2009 EAp2: Minimum Energy Performance
posted by Cristina Valenzuela on Apr 25, 2011, 6:26 pm

My client is doing an interior renovation of a small office at the ground floor in an existing mixed-use building. Over the office there are residential units, and below it there is an...

Last reply: Marcus Sheffer, Nov 23, 2011, 6:18 pm

Clarification

General forums
posted by Alexa Stone on Nov 16, 2011, 2:58 pm

Hi Puteri,
Your wording is a little confusing. I think what you are trying to ask is what LEED Rating system would use for a new construction District Cooling Plant? If that's it then your...

Last reply: Alexa Stone, Nov 23, 2011, 1:58 pm

Reclaimed Wood Floor- SCAQMD or FloorScore?

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Jeremy Knoll on Jan 19, 2011, 10:40 am

I just want to be sure that I understand correctly that any...

Last reply: Catalina A, Nov 23, 2011, 1:41 pm

Fenestration in Baseline

NC-2009 EAc1: Optimize Energy Performance
posted by Darin Frick on Apr 12, 2010, 8:19 am

I need to verify what is meant by proportionally distributed. I originally understood the distribution to take the total fenestration for the building and then create a band of windows around...

Last reply: Marcus Sheffer, Nov 23, 2011, 1:30 pm

Existing shower facilities used for previous LEED certification

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Sharlene Angeles on Nov 23, 2011, 12:38 pm

Our project site has a sufficient changing/shower facility that is existing in another building that also achieved LEED certification, including this point. If that changing facility is located...

Last reply: David Posada, Nov 23, 2011, 1:20 pm