Forum quick links
Electronic equipment
CI-2009 MRc2:Construction Waste Managementposted by Agnieszka Rylska on
Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the
MRc4 Recycled Content Calculation
NC-2009 MRc4:Recycled Contentposted by Jack Jennings on
Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional Materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
About Existing Building for Retail
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Esteban Martinez on
Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.
Belated Project Registration / Certification Process Feedback
posted by Daniela Mendez on
Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.
Temporary potable connection to a permanent irrigation system
Schools-2009 WEc1:Water Efficient Landscapingposted by Bradley Smith on
I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.
Tab 6-1 and 6-4
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?
Building's equipment still uncertain
NC-v4 EAc3:Advanced energy meteringposted by Maria Matos on
Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.
Power generator
NC-v4 EQc9:Acoustic performanceposted by Alicja Bieszyńska on
Does this credit take power generators into account? It's not a HVAC equipment, however it's quite loud...
Meeting room ID+C: CI certification
CI-v4 MPR3:Must comply with project size requirementsposted by Silvia Ruiz on
Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.