Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Electronic equipment

CI-2009 MRc2:Construction Waste Management
posted by  Agnieszka Rylska  on 

Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the

1
Wed Apr 5, 2017, 3:21 pm

MRc4 Recycled Content Calculation

NC-2009 MRc4:Recycled Content
posted by  Jack Jennings  on 

Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?

1
Fri Apr 7, 2017, 1:08 am

Concrete Regional and Recyle Content

NC-2009 MRc5:Regional Materials
posted by  Rick Alfandre  on 

I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th

1
Thu Jun 15, 2017, 3:24 pm

About Existing Building for Retail

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Esteban Martinez  on 

Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.

1
Thu Aug 31, 2017, 11:44 pm

Belated Project Registration / Certification Process Feedback

General forums
posted by  Daniela Mendez  on 

Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.

1
Wed Apr 5, 2017, 8:41 pm

Temporary potable connection to a permanent irrigation system

Schools-2009 WEc1:Water Efficient Landscaping
posted by  Bradley Smith  on 

I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.

1
Sun Aug 27, 2017, 12:48 am

Tab 6-1 and 6-4

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?

1
Thu Apr 20, 2017, 3:37 pm

Building's equipment still uncertain

NC-v4 EAc3:Advanced energy metering
posted by  Maria Matos  on 

Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.

1
Wed Apr 12, 2017, 1:35 pm

Power generator

NC-v4 EQc9:Acoustic performance
posted by  Alicja Bieszyńska  on 

Does this credit take power generators into account? It's not a HVAC equipment, however it's quite loud...

1
Wed Aug 30, 2017, 5:28 pm

Meeting room ID+C: CI certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Silvia Ruiz  on 

Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.

1
Thu Apr 6, 2017, 5:23 pm