Forum quick links
fixture group for toilet in a private office
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on
The project (office building) has a few private (executive) offices which have their own assigned private toilet. This is intended for use only by the assigned executive.
pantry sinks
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on
Is there a guideline for pantry sinks in office spaces?
Demolished Irrigation System
NC-2009 WEc1:Water Efficient Landscapingposted by Gregory Martin on
I am working on a renovation project on a college campus that has made efforts to be more sustainable.
Organic Fertilizer
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Andy Rhoades on
My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.
Precertification - LEED 2009 Core & Shell
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Michael Heacock on
We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.
Garage/service openings with driveway crossings at sidewalk
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu
v2009 Min. Performance Calculator - Service Hot Water Inputs
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
With reference to Service Hot Water should the following baseline inputs match the proposed; If not where can I find good guidnace on how these baseline inputs can be obtained.
RE: SSc5.1: It looks like a greenfield site but may not be???
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Joe Manganelli on
Hi All, I am working on a 200 acre site that looks like greenfield farmland.
shared waste area
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Agnieszka Rylska on
I am working on two projects which will be certified separately. They are located next to each other and they share waste area and waste bins.