Pilot Credit Closed?

Pilot-Credits IPpc88:LEED O+M Starter Kit
posted by  Angela Wisely  on 

It appears this pilot credit closed on August 16th. I believe I can still submit it as long as I registered under the pilot credit before that date, correct?

0

PTAC Monitoring

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Dutchie Grossweiner   on 

In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).

1
Mon Oct 24, 2016, 1:41 pm

LEED Rating System Transition to LEEDv4 / Campus Registration

LEED Guidance for Campuses and Multiple Buildings
posted by  Ali Scander  on 

Hello, I'm working on a LEED 2009 project which will require a Campus registration on LEED Online.

1
Mon Oct 24, 2016, 8:10 am

Residential Core & Shell

LEED Rating System Selection
posted by  soha yamani  on 

Hello all I am working on a project that consists of 12 residential buildings with 3 prototypes each prototype has 4 identical residential buildings ( 5 stories each) however the owner will comp

1
Thu Feb 2, 2017, 3:30 pm

water cooled chillers

NC-2009 EAp2:Minimum Energy Performance
posted by  sherif el adly  on 

Hi Marcus, I am working on a project in KSA of about 404330ft2.

1
Sun Oct 23, 2016, 7:51 pm

Rug

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Alicia Costas Freire  on 

Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.

1
Mon Oct 24, 2016, 10:48 pm

Group or single project?

LEED Guidance for Campuses and Multiple Buildings
posted by  David Lazaro  on 

Hello, We are pursuing LEED EBOM v2009 for an office complex. The project was built at the same time and has two twin buildings, with independent HVAC systems.

1
Mon Oct 24, 2016, 6:15 pm

Social equity within the community

NC-v4 INc1:Innovation
posted by  Miriam Ramirez Baumgarten  on 

Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.

0

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Valentin Grimaud  on 

What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t

1
Tue Jan 17, 2017, 9:15 pm

Chilled water flow and pipe sizes

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Jayakumar Pamuri  on 

Hi All, I am here to post my query about chilled water system,flow and pipe sizes.

1
Wed Oct 26, 2016, 7:10 am