Option-3: Irrigation Meter Installed
EBOM-v4 WEc1:Outdoor water use reductionposted by VISHESH AGARWAL on
i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Calculator Points clarification
Pilot-Credits MRpc102:Legal Woodposted by Patrice McVeigh on
Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.
How to simulate qualified area for IEQc8.1 at both 9 am and 3pm
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Cathy W on
Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result.
Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
questions about additional HVAC system in kitchen
CS-2009 EAp2:Minimum Energy Performanceposted by Zhang Peng on
Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.
Commissioning using generator
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Omar Elrawy on
Dear all, I have a case where project team suggests running all Cx activities on the building's emergency generator, in addition to an external generator.
Survey Participants
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Fareed Alghimlas on
We’re working towards the certification of a large office building, where a good portion of the (FTEs) are subcontractors who spend time (minimum 40hrs/week) in the building but don’t necessarily h
Satisfaction rating
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Fareed Alghimlas on
Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?