Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option-3: Irrigation Meter Installed

EBOM-v4 WEc1:Outdoor water use reduction
posted by  VISHESH AGARWAL  on 

i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.

1
Wed Mar 8, 2017, 11:34 pm

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm

Calculator Points clarification

Pilot-Credits MRpc102:Legal Wood
posted by  Patrice McVeigh  on 

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.

0

How to simulate qualified area for IEQc8.1 at both 9 am and 3pm

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Cathy W  on 

Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result.

0

Church+Classrooms = Office?

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Charles Shinneman  on 

I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.

1
Sat Aug 26, 2017, 3:42 pm

new building

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Bo Slendak  on 

We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.

1
Wed Jan 18, 2017, 4:14 pm

questions about additional HVAC system in kitchen

CS-2009 EAp2:Minimum Energy Performance
posted by  Zhang Peng  on 

Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.

1
Tue Aug 30, 2016, 1:53 pm

Commissioning using generator

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Omar Elrawy  on 

Dear all, I have a case where project team suggests running all Cx activities on the building's emergency generator, in addition to an external generator.

1
Mon Aug 29, 2016, 10:24 pm

Survey Participants

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Fareed Alghimlas  on 

We’re working towards the certification of a large office building, where a good portion of the (FTEs) are subcontractors who spend time (minimum 40hrs/week) in the building but don’t necessarily h

1
Wed Oct 5, 2016, 5:17 pm

Satisfaction rating

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Fareed Alghimlas  on 

Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?

1
Wed Oct 5, 2016, 5:22 pm