Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Enhance commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Mamdooh Amin  on 

Do we have to include the contract document between the owner and the CxA?

1
Tue Aug 9, 2016, 3:07 pm

MPR LEED v3 vs v4

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Lise Dannesboe  on 

Hi! There are quite some differences between MPR v3 and v4. USGBC has published a supplemental guide on MPR for v3. Is there something similar available for v4?

1
Tue Jan 17, 2017, 6:14 pm

CxA role

NC-2009 EAc3:Enhanced Commissioning
posted by  Abdulla Anwar  on 

Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?

1
Tue Aug 9, 2016, 3:27 pm

ID Credit for Radon Mitigation system

NC-2009 IDc1:Innovation in Design
posted by  Tyler Barter  on 

We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project.

1
Tue Aug 9, 2016, 2:50 pm

Building Demoliton outside my LEED Boundary

NC-2009 MRc2:Construction Waste Management
posted by  Faith Wilbert  on 

Hello, I'm currently working on a project where we are building a new dormitory. When the new dorm is up and running the existing dorm down the road will be demolished.

1
Sun Aug 14, 2016, 6:51 pm

what all is included in material cost

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brianna Brandsen  on 

Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?

1
Mon Aug 15, 2016, 9:30 pm

Building footprint

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Febin Mohamed  on 

We are doing a campus approach for our project.

1
Tue Jan 17, 2017, 10:46 pm

Low-Emitting Content Criteria for Wallcovering in EBOM v2009

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Noriko Nagazumi  on 

Do you have any idea for Low-Emitting Content (VOC) criteria of wallcovering like adhesives or sealants for LEED EBOM v2009 projects? Our project is an office building, and vinyl wallcoverings in s

1
Fri Aug 12, 2016, 6:34 pm

Multi-occupant Spaces Vs. Patients rooms

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  VICTOR MORENO  on 

Hi, I´m managed a Healthcare buildings. The reviewer advice me that workstation and share multi-occupant spaces must be reported consistently among IEQc6.1 and IEQc6.2 credits.

1
Wed Jan 18, 2017, 12:53 am

Multi-occupant Spaces Vs. Patients rooms

Healthcare-v2009 IEQc6.1:Controllability of systems - lighting
posted by  VICTOR MORENO  on 

Hi, I´m managed a Healthcare buildings. The reviewer advice me that workstation and share multi-occupant spaces must be reported consistently among IEQc6.1 and IEQc6.2 credits.

1
Tue Aug 29, 2017, 8:55 pm