posted by Charalampos Giannikopoulos on
There are seven existing buildings on a site, all owned (the site and the buildings) by the same entity who leases the buildings to tenants.
New Residential Building
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We have completed the Energy Model for New Residential Building which will be located in India.
Heat pump water heater
CS-v4 EAc6:Enhanced refrigerant managementposted by Ammon Palmer on
We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.
Hotel Room Lighting Exceptional Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Outdoor Air Delivery Monitoring - Installation of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by SAMY Chamy on
1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.
EPD's for architectural woodwork
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paul Setzer on
Hello- As I read the v4 MR requirement for EPD's, they apply to assembled products.
n/a
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.5 states: Ventilation.
IPM in Place and No Pesticides Used
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Ryan Hoffman on
We are working on a recertification. The vendor says they have not applied any pesticides during the performance period.
Default Occupancy for a Health Club
posted by Paula Hernandez on
Hello everyone, We are currently working on a C&S office building, that has also some retail space and a health club space in one floor.