Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Ashrae 90.1 2010 Appendix G

NC-v4 EAp2:Minimum energy performance
posted by  junaid naseer  on 

Do we need to follow addendums of ASHRAE 90.1 2010 in relation to Appendix G for compliance? For instance, addendum F restricts window to wall ratio to 34% for hotel/motel with rooms greater than

1
Mon Apr 25, 2016, 2:18 pm

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Open Space: Fence

NC-v4 SSc3:Open space
posted by  Sophie Brauer  on 

Hello, I'm trying to assess how much of our project site qualifies as open space.

1
Mon May 2, 2016, 3:49 pm

DDA Boundary

NC-v4 LTc3:High priority site
posted by  Trevor Anderson  on 

Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?

1
Thu Apr 21, 2016, 3:27 pm

Non potable water reservoir - WEc1 -NC 2009

NC-2009 WEc1:Water Efficient Landscaping
posted by  Muriel Alvarez  on 

We are certifying a project NC 2009 and we are counting in our credit with a non potable reservoir outside the LEED Boundary but is within the limits of the property.

1
Wed May 18, 2016, 8:50 pm

SSc4.3 Sign Text

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Steve Valev  on 

We are working on a community college project which has has an existing parking lot serving the entire campus that already provides enough parking count to cover the parking load of our project. W

1
Wed Apr 20, 2016, 2:47 am

EAc1.3

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Dipti Talwar  on 

Hi, I have couple of queries regarding EAc1.3 Option 1- Equipment efficiency 1.We are doing a interior fit out project (LEED CI), in which the complete building (100%) will be leased to a single

1
Mon Apr 25, 2016, 6:48 pm

EAC4 Enhanced Refrigerant Management

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Sahar Al-Khairi  on 

In a project I'm working on , we are using two heat pumps for cooling and heating,such that only one heat pump is going to be used during the summer season(cooling) and both pumps are to be used in

0

LEED for Homes Training in Europe

LEED for Homes (LEED-H) Forum
posted by  Emmanuel Pauwels  on 

We are planning on organizing Green Rater and HERS training in Europe later this year. If anyone is interested, go not hesitate to get in touch with me.

0

Option 4 - Transit Services Referenced

ND-v2009 NPDc8:Transportation demand management
posted by  Sara Zoumbaris  on 

For this credit under Option 4, there is a requirement to include additional spaces if our project has more than 100 dwelling units/ employees and has a minimum transit service of 60 daily weekday

1
Wed Apr 20, 2016, 3:16 pm