Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Boundary and Non-contiguous reconfigured areas

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aaron Ketner  on 

Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.

0

EBOM Solid Waste Management Policy in Medical Office Building

NC-2009 IDc1:Innovation in Design
posted by  Sara Goenner Curlee  on 

My project is pursuing LEED NC, and was hoping to use MRp2 as an innovation credit.

1
Mon Mar 13, 2017, 5:31 pm

Waste Management

NC-2009 MRc2:Construction Waste Management
posted by  Ali Scander  on 

Hello, I'm concerned about our project earning points for MRc2.

1
Tue Feb 16, 2016, 9:30 pm

Two Identical Buildings

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Paula Hernandez  on 

Hi, we want to achieve the Precertification for a CS project. There are two office buildings, almost identical, on the same parcel. They share four underground parking levels.

0

Baseline Economizers

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Paula Hernandez  on 

Standard ASHRAE 90.1-2010 states that Outdoor air exonomizers shall be included in baseline HVAC systems 3 trhough 8, with the exception 6.5.1d: Systems that include a condenser heat recovery syste

0

Recycling area for MR Pre-req in a small historical building

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Veronica Reed  on 

Hello We are developing a ver small 12 room hotel in a historical landmark building in the historic center of Quito, all houses in the block from late 1800's, thus the building was a former single

1
Wed Feb 17, 2016, 1:33 am

Technical Advice

EBOM-2009 EAc6:Emissions Reduction Reporting
posted by  Eleftherios Zacharakis  on 

Hi, we used ENERGY STAR Portfolio Manager to estimate the CO2 emissions of a project.

1
Sun Apr 24, 2016, 2:12 am

Tenant Space Energy Modeling

CI-v4 EAp2:Minimum energy performance
posted by  Paula Hernandez  on 

To comply with EA_p2 we are goint to develo the energy simulation of the Tenant Space Scope of Work. My questions are: 1.

0

Peak Transients

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  timothy thomas  on 

The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.

1
Mon Mar 21, 2016, 6:20 pm

Option 1 - What to include in Site Area calc

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Jay Murray  on 

I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.

1
Thu Apr 14, 2016, 12:16 am