Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Future Fit-Out Space & Transients - Table Plf3-3 or Table Pfl3-4

Healthcare-v2009 PIf3:Occupant and Usage Data
posted by  Catherine Blakemore  on 

My project is an addition with on future being future fit-out space.

0

Limiting site disturbance

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Michael Smithing  on 

We have a site which meets the definition of greenfield. It was previously in agricultural use, and is now located in an industrial park.

0

Baseline Model Inputs

CS-2009 EAc1:Optimize Energy Performance
posted by  Ciaran McCabe  on 

For the baseline model can I please confirm the following; Design Cooling SAT: According to ASHRAE 90.1 G3.1.2.8 should the supply temperture be 11 deg C less than room temp.

1
Tue Dec 15, 2015, 3:17 pm

feedback

Pilot-Credits EApc65:Monitoring based commissioning
posted by  emily reese moody  on 

There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.

0

Ceramic Wall base

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Neetika Parmar  on 

Does ceramic wall base have to be certified under Floorscore or does it automatically qualify similar to mineral based flooring tile ??

1
Wed Dec 16, 2015, 7:53 pm

multi-occupant space that can be divided in two.

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Saju Varghese  on 

we have a multipurpose space that can be divided into two space depending on the necessity of the users. Does this require one or two controls?

1
Wed Dec 16, 2015, 11:52 pm

VRP in the space matrix

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, What does VRP stand for in the column IEQp1 of the space matrix?

1
Thu Feb 11, 2016, 8:11 am

Exterior lighting - Baseline Building

NC-2009 EAc1:Optimize Energy Performance
posted by  VICTOR MORENO  on 

To simulate the exterior lighting in Baseline Building, i have to model it according table 9.4.5 of Standard 90.1? Or it is not possible to earn points for exterior lighting systems? Thanks in ad

1
Fri Dec 18, 2015, 3:45 pm

Bicycle requirement

NC-v4 LTc6:Bicycle facilities
posted by  Veronica Reed  on 

Hello, we are working on a very small 12 room hotel in a historic landmark building, and were considering moving the project from LEED v2009 to LEED V4, but find some issues with this credit requir

1
Mon Jan 4, 2016, 11:03 pm

Global Compliance Paths EN 15251

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Elodie DUMAS  on 

Hi, There's several quality level for interior air in EN 15251 : category I to III.

1
Tue Jan 19, 2016, 10:20 am