O+M Starter Kit - Systems O+M Plan
NC-v4 INc1:Innovationposted by Kelsey Jensen on
Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?
Excluding demand for occupancy sensors in retail sales area
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Eleftherios Zacharakis on
I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.
LEED Boundary adjacent to the Ocean
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Thomas Ehrnschwender on
Project is adjacent to the Atlantic Ocean. The sand dune is protected with many native plant species and a nesting habitat for 5 different endangered turtle species.
Future Pedestrian Access
NC-2009 SSc2:Development Density and Community Connectivityposted by Rachel Weber on
We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?
IEQ-4 Credit documentation
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Frank Burkhart on
I am hoping someone can direct me as to the best way to fill out the IEQ-4 forms given the situation. We are in a pre-bid situation filling out the LEED forms, and because it is public bid work we
Very old CI 2009 registered project - can we still certify?
CI-2009 PIf1:Minimum Program Requirementsposted by Eric Thompson on
Hi I'm helping a colleague who has a project that was registered in 2011 for LEED CI 2009 and construction completed / substantial completion in 2011.
VRP Compliance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
Tools and flexibility
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Devani PERERA on
There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail.
LEED V3 2009 SSc3- Asbestos contamination
posted by Patrice McVeigh on
I have a project where two forms of asbestos contamination has been identified. One on pipework and the other in the existing floor slab adhesive - SSc3 Brownfield development.
Modified rational method - rainfall intensity
NC-v4 SSc4:Rainwater managementposted by Hana Raitrova on
Dear All, I´m still wondering how to get a value of rainfall intesity in inches/hour or mm/hour for the 95th percentile (option 2 - modified rathional method) based on time concentration.