Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource? The requirements are listed and I feel this should be more of a sit down with the facility manager to gain the true information. How have others dealt with setting up this plan?
Thank you.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Christopher Davis
Sr. Sustainability Project ManagerCodeGreen Solutions
43 thumbs up
November 16, 2015 - 10:10 am
Because these credits are taken directly from LEED v4 O+M, the reference guide for this rating system would be another great resource. Much of the information for the Systems O+M Plan can likely come from working with the design engineer and the facility manager (or someone else who will be responsible for operating the completed building) to confirm that the Owner's Project Requirements are being met. Documenting sequences of operation, the building operating plan, and preventive maintenance will help ensure that the building is operated consistently as it was intended.