Forum quick links
LEED requirement in Connecticut
posted by Matt Bartner on
Hello all - We are currently working on a project that is required to meet the standards of CT Public Acts which require LEED Silver compliance as a requirement of the project funding.
1 VAV 2 offices, one restroom
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Hello. I have a question regarding the controllability of thermal comfort for 2 offices.
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
treat wastewater to teriary standards?
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??
Recording the recycling of "whitegoods"
NC-2009 MRc2:Construction Waste Managementposted by Neumann Monson on
In an effort to achieve a 95% diversion rate, my team will be submitting waste receipts for the demolition of two buildings that existed on our site before construction of the new project began.
Definition of Main Building Entrance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Annalise Reichert on
I am working on a project that has a main lobby entrance and another side entrance.
Low Flow Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ray Jones on
All, Is a break room sink in an office space considered a kitchen sink with a 2.2 gal/min baseline or a commercial lav with a .5 gal/min baseline?
Parking garages
CI-2009 SSc2:Development Density and Community Connectivityposted by Eric Thompson on
For Option 1 / Development Density - we have several large parking garages within our radius. Am I correct in thinking these would not be counted?
Building under Construction
CI-2009 SSc2:Development Density and Community Connectivityposted by Eric Thompson on
Also for Option 1 / Density, our project has two buildings under construction (independent, not related to ours). They are well under way but not complete. Could we count them?
ASHRAE AEDG Retail - Prescriptive skylight requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Alexis Voeltner on
We are working on a small retail store 18,000 sqft and we are considering pursuing the prescriptive compliance path AEDG (option 2) to meet EAp2.