Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED EBOM EA c.4

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Fabio Frescia  on 

Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.

1
Fri Oct 16, 2015, 3:18 pm

ASHRAE 55 - apartment

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Indochine Engineering VN  on 

My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.

1
Fri Dec 11, 2015, 9:50 pm

Under the same Construction Contract

LEED Guidance for Campuses and Multiple Buildings
posted by  Nicolas Pare  on 

We registered our school project (2 Buildings) as a Group Project under the LEED for School v2009 rating system. The owner & operator are now talking about splitting the project into 2 phases

1
Fri Nov 27, 2015, 9:30 pm

Common Area Spaces/Tenant Fit Out

CS-2009 EAc1:Optimize Energy Performance
posted by  Heather South  on 

I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space

1
Mon Aug 31, 2015, 2:27 pm

1 Bus Line Vs. 2

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Heather South  on 

This credit calls for a minimum of 2 bus lines to have one or more stops within a 1/4 mile walking distance of the project.

1
Sat Nov 28, 2015, 2:53 am

Using Options 1 & 2 ID Point?

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Heather South  on 

Would it be possible to get an ID point for doing both options 1 & 2? Preferred Parking for 5% of building occupants and charging stations?

1
Sat Nov 28, 2015, 2:54 am

Canopy to building with wall opening (is it a "complete bldg")?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Lee  on 

We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.

1
Fri Nov 27, 2015, 3:52 am

flush out possible by phase

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Sahar Abi-Ziki  on 

Hello the first phase (parking garage) of our project will be delivered to client for occupancy now, but the rest of the project will still be under construction for a while.

1
Tue Jan 12, 2016, 3:21 pm

43" partitions block views and negate compliance?

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Vanessa Seibert  on 

I see that there was some conversation on the views credit back in 2011.

1
Tue Dec 1, 2015, 2:29 pm

Commercial Interiors 2009 v3 - Documentation Reuse and Boundary

LEED Rating System Selection
posted by  CHRISTIAN LUTJEN  on 

Hi all, We are embarking on our office's first LEED Commercial Interiors project. The existing envelope received 2009 v3 LEED Gold for Core and Shell in 2014.

1
Fri Nov 27, 2015, 2:48 pm