Forum quick links
LEED EBOM EA c.4
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Fabio Frescia on
Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.
ASHRAE 55 - apartment
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Indochine Engineering VN on
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.
Under the same Construction Contract
posted by Nicolas Pare on
We registered our school project (2 Buildings) as a Group Project under the LEED for School v2009 rating system. The owner & operator are now talking about splitting the project into 2 phases
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize Energy Performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
1 Bus Line Vs. 2
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Heather South on
This credit calls for a minimum of 2 bus lines to have one or more stops within a 1/4 mile walking distance of the project.
Using Options 1 & 2 ID Point?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Heather South on
Would it be possible to get an ID point for doing both options 1 & 2? Preferred Parking for 5% of building occupants and charging stations?
Canopy to building with wall opening (is it a "complete bldg")?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Lee on
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.
flush out possible by phase
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Sahar Abi-Ziki on
Hello the first phase (parking garage) of our project will be delivered to client for occupancy now, but the rest of the project will still be under construction for a while.
43" partitions block views and negate compliance?
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Vanessa Seibert on
I see that there was some conversation on the views credit back in 2011.
Commercial Interiors 2009 v3 - Documentation Reuse and Boundary
posted by CHRISTIAN LUTJEN on
Hi all, We are embarking on our office's first LEED Commercial Interiors project. The existing envelope received 2009 v3 LEED Gold for Core and Shell in 2014.