Forum quick links
Concrete Sealant
NC-v4 EQc2:Low emitting materialsposted by Michelle DiPenti on
I'm having difficulty finding a concrete sealant that is in compliance with CDPH Standard Method. Can anyone recommend a concrete sealant that is in compliance with both CDPH Standard Method and th
Topics to accomplish this credit
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Hugo Pereira on
Hi all, I've been dealing with a huge problem to achieve this credit.
Other universal design strategies
Pilot-Credits PC34:Design for Adaptabilityposted by Christine Robbins-Elrod on
It would be great to see future iterations of this credit also address reinforcing for the future install of grab bars at unit bathrooms and perhaps the inclusion of a 5' turning radius at unit bat
Decorative Lighting
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Dear All, I have three questions: - We are applying for a commercial interior project, we received our final review (after prem. review) I received a new comment that wasn't mentioned in a prem.
LEED CS 2009 - WEp1 & WEc3
CS-2009 WEp1:Water Use Reductionposted by Ruel Galve on
We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.
Document Upload
NC-v4 EQc6:Interior lightingposted by Boggarm Setty on
For V4, is there no requirement anymore to upload supporting documents? I don't see any upload buttons on the form itself.
IAQ Management plan
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Charalampos Giannikopoulos on
Is there a short template of an IAQ management program based on i-BEAM? Or does the program need to bo as extensive as the i-BEAM template?
PC 81 - Clarifications
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Patty Lloyd on
Our project just completed the pilot credit for this on an interiors project. Will be interested to see the GBCI review on it.
LEED-CI vs. LEED-CI Retail
posted by Jodie Clarke on
I have registered a restaurant project using the LEED-CI rating system but I'm now thinking that LEED-CI Retail might be the better rating system for the project.
Solar Panel Energy Savings
NC-2009 EAc2:On-Site Renewable Energyposted by DILIP bussa on
hello Marcus, i am currently designing a navy lodge and it is 66,420 sq ft.its a Four floor building with 12 guestrooms on each floor about 900 sq.