Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MEP related insulation

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Linda Davisson  on 

The credit language indicates "insulation" as one of the materials subject to this credit.

1
Thu Dec 17, 2015, 1:25 am
1
Mon Jul 13, 2015, 6:34 pm

Planting in conservancy areas

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Roberto Meza  on 

Hi everyone, We have a project in a greenfield, it's conservancy areas consist of vegetation that is mostly dry grass.

1
Fri Nov 27, 2015, 4:18 am

What is the consulting cost for 5 year EBOM recertification?

General forums
posted by  Corey Lee Wilson  on 

Thanks Tristan for being a valuable resource on this matter.

0

Minimum building energy performance

ND-Plan-v4 GIBp2:Minimum building energy performance
posted by  sam Alfassy  on 

based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement.

1
Mon Jul 13, 2015, 3:23 pm

CHP Usage

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear Sir:- we have Project in China it is a NC project We don't get Electricity from Government we use natural Gas Generator for Electricity Production.

1
Wed Jul 15, 2015, 2:15 pm

adhesive powder

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Melinda Orova  on 

Dear All, Our project uses a cement based adhesive powder that will be mixed with water and then applied. We have data for the powder that it has 0 g/l VOC, and the applied quantity in kg.

1
Fri Nov 27, 2015, 8:28 pm

Historic residential building

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  LEEDme Lorenzi  on 

We are renovating a historic residential building and windows will not be replaced. We think it will be difficult to perform a blower door test.

1
Fri Nov 27, 2015, 7:49 pm

Daylight Measurements disappointing

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Joyce Kelly  on 

1.Measurements were disappointing July 15 because shading structures are doing their job and blocking direct sunlight - a blessing in Southern Arizona. Should we wait until the nx.

1
Fri Aug 14, 2015, 12:50 pm

Rideshare and Company Shuttles

NC-v4 LTc5:Access to quality transit
posted by  Amanda Johnson  on 

Hi, With the new frequency requirement I am not sure how Company shuttles (that are related to set workshifts and which only operate 8 times a day) would fit into this? The shuttle clearly reduces

1
Wed Sep 16, 2015, 7:54 pm