Equipment Baseline
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by LUCY WILLIAMS on
Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.
Non occupied spaces
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Hello, Is nonoccupied spaces are affected by this credit ?
Data center floor area like an unoccupied space
posted by Paola Moschini on
Hi everybody, Do I have to consider the data center floor area the whole area including corridors and stairs that are exclusive use of the data center or just the rooms where the CED devices are ph
RECs for Europe
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Charalampos Giannikopoulos on
Could you advise of a list of REC vendors who could provide offsite renewable energy for a project located in Europe (Greece)?
New Bus Depot: LEED BD+C or C+S?
posted by Cynthia Kaplan on
My project is the new construction of a 3,000 s.f. bus depot in a small city. Part of the space will be leased to a retailer at a later date, most likely a convenience store or coffee shop.
Testing of units with the same layout
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on
We are working on a large high-end high-rise residential project with a variety of unit sizes and layouts.
Actual Operation of Carpool parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jatuwat Varodompun on
We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.
Is Greenguard Gold certification acceptable for carpet cushions?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Arthika Saseendranath on
Is Greenguard Gold certification acceptable for carpet cushions? Or is it mandatory that it has to CRI-GLP certified?
Manufacturer Declaration Letter
NC-2009 MRc4:Recycled Contentposted by Rezkar Abdulmajeed on
We completed the design of our project in 2013 and start construction in 2014.
Appeal after second review
posted by Johnathan Woodside on
I guess my question is; does the second review include review of changes made as a result of comments made during the second review?